Mustaqeem Dyeing & Printing Industries PVT. LTD.

Geotechnical Investigation Report for Spining Mills Plot # A-240

Three (03) boreholes up to 10.0m were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

Nooriabad

Bahria Town

----

Geotechnical Investigation of Phase 2

3 holes of 15m 13 holes of 5m

Bahria Town Karachi

Pir Heaven

----

Geotechnical Investigation for G+4 Apartment

Four (04) holes were drilled, 20 m depth of each hole, laboratory testing & report writing.

PIB Colony, Karachi.

Altaf Hussain University

----

Geotechnical Investigation for Altaf Hussain University, Hyderabad.

Ten (10) holes were drilled, 20 m depth of each hole, laboratory testing & report writing.

Hyderabad

Engro

----

Soil Investigation of Vajihar Reservoir

7 holes of 150m 4 pits 3*3m 4 FDT & electric resistivity survey.

Vajihar, Islam Kot

Pak Agro Chemical

----

Soil Investigation of Cylos

Drilled two boreholes of 20.0m depth

Port Qasim, Karachi.

Meezan Beverages

----

Soil Investigation for Underground Water Tank

----

Lahore

Sufi Khalid

----

Soil Investigation of plots at Sandspit

10 holes of 11m

Sands Pit, Karachi.

NEC

SUPARCO

Geotechnical Investigation

Drilling work for Environmental site Assessment at Suparco which includes drilling, sampling, preparation of log, preservation of samples for VOCS, Non-VOCS and other chemical characteristics and finally comprehensive report writing

Korangi Industrial Area, Karachi, Sindh.

ADH

----

Geotechnical Investigation

Askari V Karachi, Sindh

ADH

----

Geotechnical Investigation

30-SU Houses 4 blocks of G+ 3 apartments, complete Soil Investigation, Laboratory testing, report writing includes foundation recommendations, bearing capacity calculations.

Askari-IV Karachi, Sindh

Railway

Pacific engineering

Geotechnical Investigation for railway track bin Qasim to Port Qasim.

Eighteen boreholes were drilled, depth varies from 12 to 22.0 m depth, Plate load test up to 10 TSF

Port Qasim, Karachi.

Mehran Marmi Pvt Ltd.

----

Core drilling of NQ size

Drilling of 35 nos. of core hole for petro-physical and petrochemical analysis of Limestone query at various palaces of Baluchistan i.e. Khuzdar for Black and Gold, Bella for Golden marble, Nushki region for Travertine and Karaak Baluchistan for Tipi and Fancy Marble

Khuzdar, Bella, Nuhski, Karaak, Baluchistan

Abdullah Mining

J.V with Subzazar

Core drilling of HQ size

Drilling of 4 nos, holes for coal cores which includes drilling, preservation, labeling of cores, provision of core boxes, geophysical logging

Lakra, Sindh

Sindh Coal Authority

Subzazar Pvt Ltd.

Core drilling of HQ size

Drilling the 8 nos. core drill of HQ size up to 700ft to 1000ft includes drilling, preservation, labeling of cores, provision of core boxes, geophysical logging

Sonda, Sindh

Baluchistan Constructors Pvt. Limited

----

Geotechnical Investigation of Dam-2A, Percolation Pond, Gorano-Sindh

Two boreholes of 25-m depth were drilled for soil investigation. Two auger holes of 15-m depth were drilled for the permeability test. In situ collapse potential test, Collapse Potential Test in Lab, vibrating Table test.

Islamkot Tharparker Sindh

Baluchistan Constructors Pvt. Limited

----

Geotechnical Investigation of Dam-2B, Percolation Pond, Gorano-Sindh

Two boreholes of 25-m depth were drilled for soil investigation. One auger hole of 15-m depth was drilled for permeability test by falling head method & constant head method, Collapse Potential Test, vibrating Table test

Islamkoht Tharparker Sindh

315 MEB

----

Geotechnical Investigation for Karachi Institute of Medical Sciences, Malir Cantt Karachi.

Eighteen boreholes were drilled. Sixteen boreholes of 20-ft depth and two boreholes of 30-ft depth.

Malir Cantt Karachi

ADH Works, (DAD -I)

----

Geotechnical Investigation for SU Houses No. 01-10, 35-44, 66-73, 96-125, 151-190, Masjid, Over Head Water Tank and Shop at Sector-H, Askari-V, Malir Cantt Karachi.

Two Hundred and three (203) boreholes were drilled.

Malir Cantt Karachi

ADH Works, (DAD - III)

----

Geotechnical Investigation for Block 55, 116, 117 & 118, G+9, Sector-B, Askari-V, Malir Cantt Karachi.

Fourteen (14) boreholes were drilled.

Malir Cantt Karachi

Railway

Pacific engineering

Geotechnical Investigation for railway track bridge.

Three holes were drilled up to 20.0 m each

Dhabeji

Futehally Chemicals (Pvt) Ltd

----

Geotechnical Investigation of Plot # W2/8, Futehally chemicals (Pvt.) Ltd, Port Qasim

Drilled six (06) boreholes up to 50.0 ft. depth and recommended bearing capacities and type of foundations

Karachi

DHA Multan

----

Geotechnical Investigation of Sector-B, C & D for Road Construction at DHA Multan

Excavated twenty-one (21) test pits in sector B, C and D, complete lab testing, report writing & recommendation of modulus of subgrade reaction.

Multan

Cost Veyor

----

Geotechnical Investigation of development in literacy, J-6 School, Rehmat Chowk, Orangi Town, Karachi

Drilled two (02) boreholes up to 30.0 ft. depth, complete lab testing and recommend bearing capacities.

Karachi

Sachal Engineering Works Pvt. Limited

----

Geotechnical Investigation of Evaporation Pond Lot-I and JPCL Channel Lot-II

Ten (10) boreholes up to 5.0m in Lot-I and II, performed complete lab testing, and recommend bearing capacities.

Jamshoro

ICC and MAJ

----

Geotechnical Investigation of Office block and Landfill area, Lot-III, Jamshoro

Thirteen (13) boreholes up to 5.0m, performed complete lab testing, and recommend bearing capacities.

Jamshoro

Karachi Water & Sewerage Board

----

Geotechnical Investigation for Greater Karachi Bulk Water Supply Scheme, K-IV, Phase-II

Forty (40) boreholes were drilled. Four boreholes of 125-ft depth, Seven boreholes of 50-ft depth and twenty-nine boreholes of 15-ft depth.

Jhampir, Thatta to Gadap Town Karachi (118 Km)

State Bank of Pakistan (SBP)

----

Geotechnical Investigation for New SBP Building at DI Khan KPK.

Five boreholes were drilled. Three boreholes of 15-m depth and two boreholes of 20-m depth.

Dera Ismail Khan KPK

China Gezhouba Group Company Limited

----

Re Geotechnical Investigation of Wind Turbine WTG_57

Geotechnical Investigation Holes of 20.0 m depths, recommendations of bearing Capacity

Jhampir area

Shaheen Foundation

----

Geotechnical Investigation for 50MW Wind Power Project by Shaheen Foundation, PAF at Bholari, District Thatta Sindh

Ten (10) boreholes were drilled. Seven boreholes of 20-m depth and three boreholes of 10-m depth & Electric resistivity survey (10 probes)

Bholari, District Thatta Sindh

Shaheen Foundation

----

Geotechnical Investigation of Falcon Shopping Mall, PAF Base Faisal, Karachi

Five Boreholes were drilled. Four boreholes of 60-ft depth and one borehole of 100-ft depth.

PAF Base Faisal Karachi

Bahria University

----

Geotechnical Investigation for Proposed Block Extension at Bahria University Karachi Campus.

Five (05) boreholes were drilled. Each having 60-ft depth.

Bahria University Karachi Campus

Mehran Enterprises

----

Geotechnical Investigation at Cliff Vista Gulistan-e-Johar, Karachi.

Two boreholes were drilled. One borehole of 40-ft depth and another of 25-ft depth.

Gulistan-e-Johar Karachi

Khalid Mushtaq Motors

----

Geotechnical Investigation of Plot No. A-330, Nooriabad.

Three boreholes were drilled. Each of 10-m depth.

Nooriabad

Mr. Kashif Illyas

----

Geotechnical Investigation at A-357, Block 6A, Mehran Town, Korangi Karachi.

Two boreholes were drilled. Each having 65-ft depth.

Mehran Town, Korangi Industrial Area, Karachi

Fauji Fertilizer

East West Infiniti

Geotechnical Investigation for Construction of Wind Met Mast B at Jhampir, District Thatta Sindh.

One borehole of 30-m depth was drilled.

Jhampir, District Thatta Sindh

Pakistan Cables Ltd.

Al-Hadeed Engineering

Geotechnical Investigation of Pakistan Cables Limited, Site Area Karachi.

Six boreholes were drilled. Two boreholes of 50-ft depth and four boreholes of 40-ft depth.

SITE Area, Karachi

Sachal Engineering Works Pvt. Limited

----

Geotechnical Investigation of Badin to Mithi Road for Bridge Construction. (RD # 4+311.50m)

Two boreholes of 35-m depth were drilled.

District Badin

Baluchistan Constructors Pvt. Limited

----

Geotechnical Investigation of Dam-1A, Percolation Pond, Gorano-Sindh

Two boreholes of 25-m depth were drilled for soil investigation. Two auger holes of 15-m were drilled for the permeability test.

Islam kot Tharparker Sindh

BAHRIA TOWN

----

Final Geotechnical Investigation Report For Eight Marla Home, Precinct-23A, Bahria Town Karachi.

Seventeen (17) boreholes up to 10.0m depth were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

KARACHI

ENVISION ENGINEERING

----

Geotechnical Investigation for Islamkot, Tharparkar Sindh.

Complete lab results are included in the report.

THAR, SINDH

SEPCO

----

Geotechnical Investigation report for construction of 132kv SDT Transmission line, new Rohri 132/220kv grid station Sukkur site.

Fifteen (15) boreholes up to 10.0m to 35.0m depth were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

SUKKUR

LT. COL. RAFIQUE KHATTAK

----

Five (05) boreholes up to 33.0-ft depth were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

TURBAT

S.G. ARCHITECT & URBAN DESIGNER

----

Geotechnical Investigation report for Cadet College, Turbat Baluchistan.

Ten (10) boreholes up to 30.0-ft depth were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

TURBAT

Bahria University Karachi

----

Geotechnical investigation for proposed library blocks ext. & academic block at Bahria University, Karachi.

Three (03) boreholes including, One (01) up to 70.0 ft. One (01) up to 100 ft. and One (01) up to 80.0 ft. depth was drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

Karachi

Omni Motorsport Pvt. Ltd.

----

Geotechnical investigation report for airmen Golf course & recreation park, Karachi

Drilled four (04) boreholes up to 40 ft. depth & Six (06) test pits of 5.0 ft. depth, complete lab testing, and report writing & recommendations of bearing capacity

Karachi

M/S Maqbool & Zarghoon JV.

----

Geotechnical investigation for improvement & widening of qila saifullah-loralai-waigum road section,brdge at rd 113+937, 123+184.35, 108+225, 84+590& 128+057. N-70.

Drilled Nine (09) boreholes up to 30 m. depth, complete lab testing, and report writing & recommendations of pile capacities on several depth and dia.

Qila Saifullah Loralai, Balochistan.

Fazaia Housing Scheme, Karachi

SFETIC

Two (02) test were performed up to 1600 KPa test load and determine the Net settlement of the area

Karachi.

Scheme Karachi, Site-01

SEPCO

----

Geotechnical Investigation report for construction of 132kv SDT Transmission line, new Rohri 220/132kv grid station Sukkur site 132kv grid station from location no. 01 (loose point) to location no.74 (loose point).

Fifteen (15) boreholes including, five (05) up to 15.0m, four (04) up to 20.0m, four (04) up to 10.0m, one (01) up to 35.0m and one (01) up to 25.0m depth were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

KARACHI

BAIG METAL CRAFTS

----

Final Geotechnical Investigation Report Of Plot# H-160 / Z-24, S.I.T.E, Super Highway, Karachi.

Three (03) boreholes up to 50.0-ft depth were drilled, complete lab testing and recommend bearing capacities.

KARACHI

SECMC

----

Geotechnical Investigation Report for Construction of Tower-06 & Tower-07, Coal Handling System for Open Cast Lignite Mine at Thar Block-II.

Five boreholes (05) up to 20.0m depth were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

Thar, Sindh

SAIMA REAL ESTATE

----

Report For Pile Load Test On Plot No. Com-3, Saima Downtown, Hyderabad.

Report writing & recommendations of pile capacities on several depth and dia.

HYDERABAD

HOME BUILDER AND DEVELOPERS

----

Report for pile load test on test Pile at plot # 477-B, main national highway opp. Sindh museum, Qasimabad, Hyderabad, Sindh.

Report writing & recommendations of pile capacities on several depth and dia.

HYDERABAD

FAZAIA HOUSING SCHEME KARACHI

----

Total of two numbers of Plate Load Tests was carried out at the site.

KARACHI

M/S AMZED TEXTILE

----

Final Geotechnical Investigation Report of Plot # F/753, Site Area, Karachi.

Two (02) boreholes up to 30.0-ft were drilled, complete lab testing and recommend bearing capacities.

KARACHI

TAI BROTHERS ASSOCIATES

----

Geotechnical Investigation Report for Roltus Industries at Plot# E-94, North West Industrial Zone, Karachi.

Three (03) boreholes including two boreholes (02) up to 30.0-ft & (01) up to 40.0-ft depth were drilled, were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

KARACHI

DESCON ENGINEERING LIMITED

----

Geotechnical investigation report of PMO office and residency for Guddu barrage project.

Three (03) boreholes including two boreholes (02) up to 15.0m& (01) borehole up to 10.0m depth were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

SINDH

Q & Q FOOD INDUSTRIES

----

Geotechnical Investigation at Q & q food industries, Karachi.

Five (05) boreholes including one up to 100.0-ft, two up to 50.0- ft. & two up to 30.0-ft were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

KARACHI

SEPCO

----

Geotechnical Investigation report for construction of 132kv double circuit line feed for Ratodero grid station in and out from 32kv double circuit line feed, Lodra, Larkana transmission line.

Three boreholes (03) including one (01) up to 20.0m & two (02) up to 15.0m was drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

LARKANA

S.M ENTERPRISES

----

Final Geotechnical Investigation Report of shell warehouse, Port Qasim, Karachi.

Three boreholes (03) including two (02) up to 40.0-ft & one up to 100.0-ft were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

KARACHI

JAWWAD INDUSTRIES

----

Final Geotechnical Investigation report for plot # F/2-Z/3, Site Area, Karachi.

Two boreholes up to 50.0-ft were drilled, including report writing, recommendations of bearing capacity & foundations.

KARACHI

ASIAN DEVELOPMENT BANK

----

Geotechnical Investigation Report for Construction & Improvement of Bridge At RD#44+230, ICB-SPRIP-04 Sanghar To Mirpurkhas Section.

One (01) borehole was drilled up to 40.0m depth, including report writing, recommendations of bearing capacity & foundations.

MIRPURKHAS

SECMEC

----------

Investigation holes and coring of HQ size

Drilling of 56 nos. core drill of HQ size up to 200 m to 250 m includes drilling, preservation, labeling of cores, provision of core boxes, geophysical logging

Islamkot, Tharparkar

Mustaqeem Dyeing & Printing Industries PVT. LTD.

Geotechnical Investigation Report for Spining Mills Plot # A-240

Three (03) boreholes up to 10.0m were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

Nooriabad

Diamond Enterprises PVT. LTD.

Geotechnical Investigation for Plot # F 2, Eastrian Industrial Zone

Six (06) borehole upto 10.0m were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

Port Qasim Karachi

Kompass Pakistan

Geotechnical Investigation for plot # W2/48 Kompass Pakistan

Four (4) Borehole from which 02 bore up to 50 ft. 01 bore upto 30ft. And 01 bore upto 22ft. were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

Port Qasim Karachi

Shangrila PVT. LTD.

Geotechnical investigation Report of Plot # 94

Four (04) boreholes up to 15.0m were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

Gulshan-e-Maymar, Karachi

ASF Foundation

----

Geotechnical Investigation Report for Contruction of main Bulevard Package 03 Bridge, Construction Ph-01, ASF City Karachi.

Four (04) boreholes up to 35.0m were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

ASF City, Karachi

Xinjang beixin road & bridge group co. Ltd.

GEOTECHNICAL INVESTIGATION REPORT FOR CONSTRUCTION OF ADDITIONAL 2-LANE CARRIAGE WAY (Bridge-01, 02, 03 & 04) from Petaro to Sehwan N55.

Nine (09) boreholes were drilled up to 35 m to 45m depth including 04 borehole at bridge 01, 02 boreholes at bridge 02 & 03 and 01 borehole at bridge 04, Complete Lab Testing, and Report writing, recommendations of bearing capacity, pile capacity & foundations.

Sehwan

Gravity One

Al-Qazi Constructors Civil & Piling Works

Report of Pile Load Test for Gravity One on Plot Com-14&15, Block 04 Scheme 05, Kahkashan Clifton.

Report writing & recommendations of pile capacities on several depth and dia.

Karachi

ASF Foundation

Geotechnical investigation report for ASF academy near airport, Karachi

Drilled Total Ten (10) boreholes, five boreholes up to 6.0m & five boreholes up to 10.0m depth, Complete Lab Testing, Report Writing, and Recommendation of Bearing Capacity & Foundation.

Karachi

Hybrid Technics (Pvt.) Limited

Geotechnical Investigation Report of Hi-Tech Metals Special Economic Zone (Pvt.) Limited, Dhabeji, Thatta

Drilled a total 06 borehole up to 10.0m, complete lab testing, report writing, recommendations of bearing capacity & Foundation.

Dhabeji, Thatta

Malik Textile Industries (Pvt.) Limited

Geotechnical Investigation Report for Malik Textile Industries at Plot # L-30, Block-22, F.B Area Karachi

Drilled 04 borehole one bore up to 15.0m, one bore up to 10.0m and two bore up to 12.0m depth. Complete Lab, Testing, Report Writing, the recommendation of Bearing Capacity and foundation

Karachi

Directorate of Housing

Geotechnical Investigation Report for I.H House # 340, 342, 344, 346, 348, 350, 352, 354, 356 to House # 391 at AFOHS, New Malir, Karachi

Drilled 86 borehole 02 boreholes was drilled at each plot, complete lab testing, and Report Writing, the recommendation of bearing capacity & foundation of each plot.

Karachi

DHA MULTAN

----

Final Geotechnical investigation of sector-B, C and D at DHA Multan.

Six (06) to eight (08) test pits were excavated Field density test performed, lab testing, and report writing.

DHA MULTAN

MUQEET GHEE (PVT.) LIMITED

----

Final Geotechnical Investigation report of plot# A-15, Muqeet ghee (PVT.) Limited. Karachi.

Three (03) boreholes including, two (02) up to 10.0-ft and one (01) up to 20.0-ft depth were drilled, Complete lab testing, and report writing, recommendations of bearing capacity & foundations.

KARACHI

LOCAL GOVT. DEPT. (KDA) GOVT. OF SINDH.

----

Final Geotechnical Investigation report of the overhead water tank at Jaffar Tayyar Society, Near Imamia Imam Bargah, Karachi.

One (01) boreholes up to 100.0-ft depth was drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

KARACHI

ARMY DIRECTORATE HOUSING (ADH)

----

Geotechnical Investigation report for 04-Bed Apartment, (1b+G+8)-Story, Block-01, Block-02, Block-03, Block-13 & Block-14, DHA city, Karachi.

Twenty (20) boreholes upt0 60.0-ft to 100.0-ft depth were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

KARACHI

Directorate of Housing

Geotechnical Investigation Report for I.H House # 340, 342, 344, 346, 348, 350, 352, 354, 356 to House # 391 at AFOHS, New Malir, Karachi

Drilled 86 borehole 02 boreholes was drilled at each plot, complete lab testing, and Report Writing, the recommendation of bearing capacity & foundation of each plot.

Karachi

DHA MULTAN

Final Geotechnical investigation of sector-B, C and D at DHA Multan.

Six (06) to eight (08) test pits were excavated Field density test performed, lab testing, and report writing.

DHA MULTAN

MUQEET GHEE (PVT.) LIMITED

Final Geotechnical Investigation report of plot# A-15, Muqeet ghee (PVT.) Limited. Karachi.

Three (03) boreholes including, two (02) up to 10.0-ft and one (01) up to 20.0-ft depth were drilled, Complete lab testing, and report writing, recommendations of bearing capacity & foundations.

KARACHI

LOCAL GOVT. DEPT. (KDA) GOVT. OF SINDH.

Final Geotechnical Investigation report of the overhead water tank at Jaffar Tayyar Society, Near Imamia Imam Bargah, Karachi.

One (01) boreholes up to 100.0-ft depth was drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

KARACHI

ARMY DIRECTORATE HOUSING (ADH)

Final Geotechnical Investigation report for Su House no. 01 to SU House no. 72 at DHA city, Karachi.

One hundred and forty-four (144) boreholes up to 20.0-ft depth were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

KARACHI

Sindh Revenue land Department

ULSC

Topographical mapping, matching boundaries, GIS mapping, Land demarcation, estimation of different nature of lands, land layout and report compiling

Topographical mapping, matching boundaries, GIS mapping, Land demarcation, estimation of different nature of lands, land layout and report compiling done for Sindh land department with ULSC.

Karachi, Sindh.

Mehran Marmi Pvt Ltd.

Coe drilling of NQ size

Drilling of 35 nos. of core hole for petrophysical and petrochemical analysis of Limestone query at various palaces of Baluchistan i.e. Khuzdar for Black and Gold, Bella for Golden marble, Nushki region for Travertine and Karaak Baluchistan for Tipi and Fancy Marble

Khuzdar, Bella, Nuhski, Karaak, Baluchistan

Abdullah Mining

J.V with Subzazar

Coe drilling of HQ size

Drilling of 4 nos, holes for coal cores which includes drilling, preservation, labeling of cores, provision of core boxes, geophysical logging

Larkana, Sindh

Buksh Industries

Construction of Tube well

Construction of tube well up to 1000ft deep for water supply has done which includes, drilling of investigation hole, hydrogeological study, yield test, conversion into tube well by enlarging the investigation hole diameter from 8” to 16”, provision and lowering of casing and silica gravel packing followed to pump test for confirmation of water quality and quantity and last a comprehensive report writing.

North Karachi Industrial Area, Karachi, Sindh.

LBOD, SIDA

Madni Engineering Construction Company

Hydrogeological Investigation

Electrical Resistivity Survey to determine the subsurface resistivity distribution by making measurements on the ground surface to delineate the aquifers, study the sub-surface lithological conditions and behavior of groundwater such as lithological nature of different subsurface formations by means of 5 test hole, these test holes was geophysical (Spontaneous potential, Natural Gamma, Single point resistance and caliper) and geological log by Logging tool, thickness and lateral extent of subsoil formations have been marked by correlating the hole from 00Rd to 75RD by help of Rockware and Logplot software. Long pump test for measuring the drawdown and cone of depression, Last to examine the groundwater potential and submitted a comprehensive recommendation and analyzed report to the client.

Nabisar, Thar, Sindh.

Sapphire

Consolidate Engineering Services

2d Electrical Resistivity Profiling For Characterization Of Subsurface Lithology

2D electrical resistivity profiling in Jhampir was conducted for identification of fracture zones in the subsurface in the area needed for the design of basement of wind turbine power plant. The report presents the findings of the Electrical Resistivity Survey conducted using the 2D resistivity profiling technique at each WTG location suggested by the client.

Jhampir Area

Sindh Irrigation And Drainage Authority

Madni Engineering Construction Company

Installation of piezometer

Re-installation of 49 nos. of piezometer includes at Kotri Barrage, river Indus at several bays at end of pavements and toe of glaci, preparation of barrages for offshore drilling by means of rig and pontoons, arrangement of ships for locomotion, drilling of 500ft drilling, sampling, provision of material of geotextile, casing, pea gravel, preparing the transitory embankments by bunny bags, laying of cable till roof, connecting piezometers with multiplexers and report writing

Kotri Barrage, Jamshoro, Sindh.

Mustaqeem Dyeing & Printing Industries PVT. LTD.

Geotechnical Investigation Report for Spining Mills Plot # A-240

Three (03) boreholes up to 10.0m were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

Nooriabad

Diamond Enterprises PVT. LTD.

Geotechnical Investigation for Plot # F 2, Eastrian Industrial Zone

Six (06) borehole upto 10.0m were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

Port Qasim Karachi

Kompass Pakistan

Geotechnical Investigation for plot # W2/48 Kompass Pakistan

Four (4) Borehole from which 02 bore up to 50 ft. 01 bore upto 30ft. And 01 bore upto 22ft. were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

Port Qasim Karachi

Shangrila PVT. LTD.

Geotechnical investigation Report of Plot # 94

Four (04) boreholes up to 15.0m were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

Gulshan-e-Maymar, Karachi

ASF Foundation

Geotechnical investigation report for ASF academy near airport, Karachi

Drilled Total Ten (10) boreholes, five boreholes up to 6.0m & five boreholes up to 10.0m depth, Complete Lab Testing, Report Writing, and Recommendation of Bearing Capacity & Foundation.

Karachi

BAHRIA TOWN

Construction of Transmission Line from New Sabzi Mandi grid station to new Bahria grid station, Karachi (Part-2 Borehole # 18, 19, 22 to 28, 39 & 40)

Fourteen (11) boreholes including eight (08) up to 15.0m & six (06) up to 10.0m were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.

KARACHI

Xinjang beixin road & bridge group co. Ltd.

GEOTECHNICAL INVESTIGATION REPORT FOR CONSTRUCTION OF ADDITIONAL 2-LANE CARRIAGE WAY (Bridge-01, 02, 03 & 04) from Petaro to Sehwan N55.

Nine (09) boreholes were drilled up to 35 m to 45m depth including 04 borehole at bridge 01, 02 boreholes at bridge 02 & 03 and 01 borehole at bridge 04, Complete Lab Testing, and Report writing, recommendations of bearing capacity, pile capacity & foundations.

Sehwan

Gravity One

Al-Qazi Constructors Civil & Piling Works

Report of Pile Load Test for Gravity One on Plot Com-14&15, Block 04 Scheme 05, Kahkashan Clifton.

Report writing & recommendations of pile capacities on several depth and dia.

Karachi

Hybrid Technics (Pvt.) Limited

Geotechnical Investigation Report of Hi-Tech Metals Special Economic Zone (Pvt.) Limited, Dhabeji, Thatta

Drilled a total 06 borehole up to 10.0m, complete lab testing, report writing, recommendations of bearing capacity & Foundation.

Dhabeji, Thatta

Malik Textile Industries (Pvt.) Limited

Geotechnical Investigation Report for Malik Textile Industries at Plot # L-30, Block-22, F.B Area Karachi

Drilled 04 borehole one bore up to 15.0m, one bore up to 10.0m and two bore up to 12.0m depth. Complete Lab, Testing, Report Writing, the recommendation of Bearing Capacity and foundation

Karachi

Nestle

Schlumberger

Video Logging of Tube Well

Video Logging, disinfection of tube well, cleaning and development of Tube Well up to 1350ft deep at DW-11 at Nestle Port Qasim Water Factory.

Port Qasim, Karachi, Sindh.

Subzazar Pvt. Ltd

Rahim Dying Pvt. Ltd.

Construction of Tube well

Work done for water supply by means of drilling work up to the 700ft deep, complete study of the aquifer, its zoning and demarcation, enlarge the diameter of the drilled hole, design of tube well according to aquifer achieve, lowering of casing and shrouding of well.

Site Industrial Area, Karachi, Sindh.

MCC resource Development Limited

Checking the inclination of the tube well

Running the plumb line method and box method for measuring verticality of well no. 1, 3 and 5, cleaning and commission of tube well no. 5 at MRDL Saindak project.

Tehlab, Taftan, Baluchistan

National Foods

Construction of Tube well

Completion of tube well of 500ft deep by the process of investigation drilling, complete aquifer study, yield test, borehole conversion into tube well by enlarging borehole diameter, lowering of casing and gravel packing, proceed by pump test for water quantity and quality and finally submission of the report.

Site Industrial Area, Karachi, Sindh.

Synohydro China

Diamond Drilling Associates

Construction of Tube well

Work done for water supply by means of drilling work up to the 700ft deep, complete study of the aquifer, its zoning and demarcation, enlarge the diameter of the drilled hole, design of tube well according to aquifer achieve, lowering of casing and shrouding of well.

Darawat Dam, Jamshoro, Sindh.

Karachi Golf Club

SGS

Drilling for monitoring well

Drilling for 3 nos. monitoring wells for measuring the water level by means of 1ft total drilling, provision and installation of casing and gravel and construction of well cape and bore plates.

Karachi Golf Club, Karsaz, Karachi, Sindh.

GETZ Pharma/ FND

Geo Professional

Electrical Resistivity Survey

Electrical Resistivity Survey for delineation of water aquifer and water potential, soil resistivity survey by means of Wenner array to demarcation the best suitable depth for proper earthling work.

Korangi Industrial Area, Karachi, Sindh.

NEC

SUPARCO

Environmental Site Assessment

Soil Investigation/ drilling work for Environmental Site Assessment at Johnson & Johnson Pakistan which includes drilling, sampling, preparation of log, preservation of samples for VOCs, Non-VOCs and other chemical characteristics and finally comprehensive report writing.

Korangi Industrial Area, Karachi, Sindh.

Toyota Society Motors

Geo professionals

Electrical Resistivity Survey

Determined the subsurface resistivity distribution by making measurements on the ground surface to delineate the aquifers, the sub-surface lithological conditions and behavior of groundwater such as lithological nature of different subsurface formations, thickness and lateral extent of subsoil formations.

Khalid Bin Waleed Road, Karachi, Sindh.

D.G Khan Cement

Hashim & Co.

Construction of Tube well

Completion of 600 feet tube well by the process of investigation drilling, complete aquifer study, yield test, geophysical logging (Gamma Gamma, Spontaneous potential, Natural Gamma, Single point resistance and caliper) borehole conversion into tube well by enlarging borehole diameter, lowering of casing and gravel packing, proceed by pump test for water quantity and quality and finally submission of report.

Winder, Baluchistan

Tobishima

Construction of Tube well

Finalized the tube well by the supervision of hydrogeologist and with the help of skilled labor, drilled investigation borehole, worked out for aquifer’s potential it's marking and zoning, conversion of borehole into tube well, lowering of casing and gravel packing, pump test and report writing.

Steel Mill, Port Qasim, Karachi, Sindh.

Corrubox

Construction of Earthing hole

Drilling 240ft, of hole 2 nos for Earthing and Installation of anode, copper wire, backfilling of earthing powder along with lime, choke and coal for better working of earthing.

Gagghar Phatak, Port Qasim, Karachi, Sindh.

Habib Rafiq Pvt Ltd.

Osmani Consultant

Geophysical Logging

Dismantling of installed submersible pump and Geophysical Logging (Gamma ray, Spontaneous potential, Natural Gamma, Single point resistance and caliper) for water well exploration for sand bed recognition and stratigraphic identification and the rank, quality, and its thickness, again installation and commissioning of tubewell.

DHA City Karachi, Nooriabad, Sindh.

Shamsi Builders

Osmani Consultant

Geophysical Logging

Dismantling of installed submersible pump and Geophysical Logging (Gamma ray, Spontaneous potential, Natural Gamma, Single point resistance and caliper) for water well exploration for sand bed recognition and stratigraphic identification and the rank, quality, and its thickness, again installation and commissioning of tube well.

DHA City Karachi, Nooriabad, Sindh.

NLC

Osmani Consultant

Geophysical Logging

Dismantling of installed submersible pump and Geophysical Logging (Gamma ray, Spontaneous potential, Natural Gamma, Single point resistance and caliper) for water well exploration for sand bed recognition and stratigraphic identification and the rank, quality, and its thickness, again installation and commissioning of tube well.

DHA City Karachi, Nooriabad, Sindh.

FWO Eng. 494 Group DCK

Osmani Consultant

Geophysical Logging

Dismantling of installed submersible pump and Geophysical Logging (Gamma ray, Spontaneous potential, Natural Gamma, Single point resistance and caliper) for water well exploration for sand bed recognition and stratigraphic identification and the rank, quality, and its thickness, again installation and commissioning of tube well.

DHA City Karachi, Nooriabad, Sindh.

FWO HQ 494 Group

Construction of Tube well

Completion of tube well by the process of investigation drilling, complete aquifer study, yield test, borehole conversion into tube well by enlarging borehole diameter, lowering of casing and gravel packing, proceed by pump test for water quantity and quality and finally submission of the report.

Near PNS Shifa, Karachi, Sindh.

National Industrial Park

Electrical Resistivity Survey and Reconnaissance Survey

Complete walkthrough for demarcation of general overall properties of structure, tectonic, general geology, geomorphology, sedimentology and topography of an area and working ERS for determined the subsurface resistivity distribution by making measurements on the ground surface to delineate the aquifers, the sub-surface lithological conditions and behavior of groundwater such as lithological nature of different subsurface formations, thickness and lateral extent of subsoil formations.

Steel Mills, Port Qasim Area, Karachi, Sindh.

Pearl Confectionary

Construction of Tube well

Work done for water supply and reverse osmosis plant working by means of drilling work, complete study of aquifer, it’s zoning and demarcation, enlarge the diameter of drilled hole, design of tube well according to aquifer achieve, lowering of casing and shrouding of well, provision of submersible pump and providing the services till the procurement of pump to pearl confectionary, chemical analysis and completed by report writing including the summary of work done and formation encounter during drilled works.

S.I.T.E Industrial Area Karachi, Karachi, Sindh.

Agriculture development for locals

Construction of Tube well

Completion of 220 nos. tube well by the process of drilling of 12” Dia borehole construct into tube well by lowering of casing and gravel packing.

Johi, Waipandi, Dadu, Sindh.

Techno consultant international

Construction of Tube well

Finalized the tube well of 350ft deep by the supervision of hydrogeologist and with the help of skilled labor, drilled investigation borehole, worked out for aquifer’s potential it's marking and zoning, conversion of borehole into tube well, lowering of casing and gravel packing, pump test and report writing.

P.E.C.H.S, Karachi, Sindh.

International Power Global Development

Construction of Tube well

Finalized the tube well by the supervision of hydrogeologist and with the help of skilled labor, drilled investigation borehole, worked out for aquifer’s potential it's marking and zoning, conversion of borehole into tube well, lowering of casing and gravel packing, pump test and report writing.

Hubco, Hub, Baluchistan

Aviation Enclave

Central builders and developers

Rehabilitation work

Rehabilitation work at Aviation Enclave site which includes cleaning of well, installation of temporary casing o smaller size and wrapping of geotextile for central builders and developers.

Gadap, Karachi, Sindh.

Qatar Charity and Alkhidmat Karachi

Construction of Tube well

Completion of 350ft deep tube well by the process of investigation drilling, complete aquifer study, yield test, borehole conversion into tube well by enlarging borehole diameter, lowering of casing and gravel packing, proceed by pump test for water quantity and quality and finally submission of the report.

Gadap City, Karachi, Sindh.

Alkhidmat Khawateen Sindh

Construction of Tube well

Work is done for water supply by means of drilling work, complete study of aquifer, it’s zoning and demarcation, enlarge the diameter of drilled hole, design of tube well according to aquifer achieve, lowering of casing and shrouding of well, chemical analysis and completed by report writing including the summary of work done and formation encounter during drilled works.

Jamia Islamia, Manglabad, Hub, Baluchistan.

Asia Poultry feed

Construction of Tube well

Work done for water supply and reverse osmosis plant working by means of drilling work, complete study of aquifer, it’s zoning and demarcation, enlarge the diameter of drilled hole, design of tube well according to aquifer achieve, lowering of casing and shrouding of well, provision of submersible pump and providing the services till the procurement of pump to pearl confectionary, chemical analysis and completed by report writing including the summary of work done and formation encounter during drilled works.

Port Qasim, Karachi, Sindh.

Karachi Port Trust

Ask Technology

Hydrogeological modeling and pump test

Hydrogeological modeling and long pump test which includes supervision of pumping test, provision and execution pump test along with all accessories and generator set, modeling of hydrological properties of aquifer by means of Aquifer test Pro software by finding of storability, hydraulic conductivity, transmissivity and aquifer type.

Kpt, Karachi, Sindh.

PSO pump (Sayn Hajin Shah).

Construction of Tube well

Completion of tube well of 700ft deep by the process of investigation drilling, complete aquifer study, yield test, borehole conversion into tube well by enlarging borehole diameter, lowering of casing and gravel packing, proceed by pump test for water quantity and quality and finally submission of the report.

Jamshoro Tool Plaza, Jamshoro, Sindh.

MPA Syed Saleh Shah Jelani

Construction of Tube well

Finalized the 2 no’s tube well by the supervision of hydrogeologist and with the help of skilled labor, drilled investigation borehole, worked out for aquifer’s potential its marking and zoning, conversion of borehole into tube well, lowering of casing and gravel packing, provision and installation of submersible pump, pump test and report writing.

Naig Shareef, Sehwan, Sindh.

Al Shaheer Slaughter

Construction of Tube well

Construction of deep tube well 3 nos. for water supply has done which includes, drilling of investigation hole, hydrogeological study, yield test, conversion into tube well by enlarging the investigation hole diameter, provision and lowering of the casing and silica gravel packing followed to pump test for confirmation of water quality and quantity and last a comprehensive report writing.

Gadap, Karachi, Sindh.

KASB builders.

Dewatering

Designing, planning and supervision of dewatering work which includes the drilling of 40 nos. hole, provision of material, construction of production well, complete provision of a pumping system, management and supervision of pumping till the waterlogging issue is recovering at Clifton for KASB builders.

Clifton, Karachi, Sindh.

Hassan Industries

Construction of Tube well

Work is done for water supply by means of drilling work, complete study of aquifer, it’s zoning and demarcation, enlarge the diameter of drilled hole, design of tube well according to aquifer achieve, lowering of casing and shrouding of well, provision of submersible pump and providing the services till the procurement of pump, chemical analysis and completed by report writing including the summary of work done and formation encounter during drilled works.

North Industrial Area, Karachi, Sindh.

John Apparel

Rehabilitation work

Rehabilitation work for tube well and provision of complete submersible [pump along the drop pipe, electrical cable, Motor control unit, bolting accessories and commissioning of tube well after rehabilitation for John Apparel.

Landhi Industrial Area, Karachi, Sindh.

Rajby washing

Construction of Tube well

Completion of 2 no’s tube well by the process of investigation drilling, complete aquifer study, yield test, borehole conversion into tube well by enlarging borehole diameter, lowering of casing and gravel packing, proceed by pump test for water quantity and quality and finally submission of the report.

Korangi Industrial Area, Karachi, Sindh.

Al-Arz Real Estate

Dewatering work

Designing, planning and supervision of dewatering work which includes the drilling of 2 nos. hole, provision of material, construction of production well, complete provision of the pumping system, management and supervision of pumping till the waterlogging issue was recovered at Bath Island for Al-Arz Real Estate.

Bath Island, Karachi, Sindh.

Sindh Rural Survival Organization

Mehran drilling company.

Construction of Tube well

Construction of 2 nos. tube well of 250ft for water supply is done which includes, drilling of investigation hole, hydrogeological study, yield test, conversion into tube well by enlarging the investigation hole diameter from 8” to 16”, provision and lowering of casing and silica gravel packing followed to pump test for confirmation of water quality and quantity and last a comprehensive report writing.

Kachi Pully, Shadad Kot, Sindh.

Najam Farmhouse

Construction of Tube well

Work done for water supply by means of drilling work up to the 500ft deep, complete study of the aquifer, its zoning and demarcation, enlarge the diameter of the drilled hole, design of tube well according to aquifer achieve, lowering of casing and shrouding of well.

Gadap, Karachi, Sindh.

Orient Energy System

Geo Professionals

Electrical Resistivity survey

Determined the subsurface resistivity distribution by making measurements on the ground surface to delineate the aquifers, the sub-surface lithological conditions and behavior of groundwater such as lithological nature of different subsurface formations, thickness and lateral extent of subsoil formations.

S.I.T.E, Industrial Area, Karachi, Sindh.

COM3

Iqbal Engineering House

Electrical Resistivity survey

Examined the groundwater potential through curve matching system, modeling through software and values obtained by the Electrical Resistivity Survey Equipment and submitted a comprehensive recommendation and analyzed report to Descon Engineering.

Clifton, Karachi, Sindh.

Syed Saleh Shah Jelani (MPA)

Electrical Resistivity survey

Determined the subsurface resistivity distribution by making measurements on the ground surface to delineate the aquifers, the sub-surface lithological conditions and behavior of groundwater such as lithological nature of different subsurface formations, thickness and lateral extent of subsoil formations.

Naig Shareef, Sehwan, Sindh.

Bosicor Oil Refinery

Geo Professionals

Reconnaissance and Feasibility survey

Reconnaissance and Feasibility survey conduct for Bosicor Oil Refinery.

Hub, Baluchistan.

Karachi Circular Authority

EMC

Reconnaissance and Feasibility survey

Reconnaissance and Feasibility survey conduct for Karachi Circularity Authority with EMC.

Karachi, Sindh.

MRDL

DNT and rehabilitation work of tube wells

DNT and rehabilitation work of tube wells.

Tehlab, Taftan, Baluchistan

PAF

Geo Professionals

Electrical Resistivity survey

ERS with report writing, to determine the aquifer potential through the sub-surface lithological conditions, the behavior of groundwater, thickness and distribution of subsoil formations.

PAF Korangi Creek Base Karachi

Descon Engineering Pvt. Ltd.

Geo Professionals

Electrical Resistivity survey

Examined the groundwater potential through curve matching system, modeling through software and values obtained by the Electrical Resistivity Survey Equipment and submitted a comprehensive recommendation and analyzed report to Descon Engineering.

S.I.T.E, Industrial Area, Karachi, Sindh.

Helping hands

Study of various projects of water tube well

Feasibility study of various projects of water tube well for helping hands.

Sindh, Baluchistan.

Karachi Grammar School­­­­

Designing of Reverse Osmosis Plant

Designing of Reverse Osmosis Plant

Clifton, Karachi, Sindh

Pak Farms

Construction of Tube well

Construction of 2 no’s of tube well for water supply is done which includes, drilling of investigation hole, hydrogeological study, yield test, conversion into tube well by enlarging the investigation hole diameter , provision and lowering of casing and silica gravel packing followed to pump test for confirmation of water quality and quantity and last a comprehensive report writing.

Nooriabad, Jamshoro, Sindh.

Sardar Ashraf D. Baluch

Construction of Tube well

The hydrogeological investigation is done for Sardar Ashraf D. Baluch

Gaaj Dam Site, Qasba, Dadu, Sindh.

SGS

Construction of Tube well

Construction of tube well for water supply is done which includes, drilling of investigation hole, hydrogeological study, yield test, conversion into tube well by enlarging the investigation hole diameter from 8” to 16”, provision and lowering of casing and silica gravel packing followed to pump test for confirmation of water quality and quantity and last a comprehensive report writing.

Korangi Site Area, Karachi, Sindh.

MOL

SGS

Environmental studies

Drilling of monitoring well for Environmental studies which include drilling, provision of construction material and demarcation of water level and fetching out the water samples done at MOL site.

Kohat, Tal Block, NWFP.

Pakistan textile city limited

Geo Professionals

Electrical Resistivity survey

ERS with report writing, to determine the aquifer potential through the sub-surface lithological conditions, the behavior of groundwater, thickness and distribution of subsoil formations.

The site, Industrial Area, Karachi, Sindh.

CTE 750 FWO

Electrical Resistivity Survey

The vertical electrical sounding of the ground at five different locations, determining subsurface lithology from 5-100m, using Schlumberger configuration.

Gawadar, Baluchistan

Electrical Resistivity Survey

The vertical electrical sounding of the ground at five different locations, determining subsurface lithology from 5-150m, using Schlumberger configuration.

Gharo, Sindh

FFBL

SGS

Electrical Resistivity Survey

The vertical electrical sounding of the ground at five different locations, determining subsurface lithology from 5-250m, using Schlumberger configuration.

Pindi Bhattian, Punjab

KESTRAL SPD

Electrical Resistivity Survey

The vertical electrical sounding of the ground at five different locations, determining subsurface lithology from 5-100m, using Schlumberger configuration.

Hyderabad, Sindh

Sindh Coal Authority

Subzazar Pvt Ltd.

Core drilling of HQ size

Drilling the 8 nos. core drill of HQ size up to 700ft to 1000ft includes drilling, preservation, labeling of cores, provision of core boxes, geophysical logging

Sonda, Sindh

Nooriabad municipal corporation

Subzazar Pvt Ltd.

Construction of tube well

Construction of 2 nos. tube well includes drilling of test hole, yield test, enlarging of diameter and pump test after the construction of tube well

Nooriabad, Jamshoro, Sindh

Maza Mango Juice Pvt. Ltd.

Construction of tube well

Thatta, Sindh

Saif Energy

Nawaz Engineering

Investigation hole

Kathoor, Jamshoro, Sindh

Essa Cement

Nawaz Engineering

Construction of tube well

Construction of tube well for water supply is done which includes, drilling of investigation hole, hydrogeological study, yield test, conversion into tube well by enlarging the investigation hole diameter, provision and lowering of casing and silica gravel packing followed to pump test for confirmation of water quality and quantity and last a comprehensive report writing.

Nooriabad, Jamshoro, Sindh

Tafreeh In

Construction of tube well

Construction of tube well for water supply is done which includes, drilling of investigation hole, hydrogeological study, yield test, conversion into tube well by enlarging the investigation hole diameter, provision and lowering of casing and silica gravel packing followed to pump test for confirmation of water quality and quantity and last a comprehensive report writing.

Nagori, Gadap, Karachi, Sindh

Silver Textile

Deep Rock Drilling

Construction of tube well

Construction of 2 nos. tube well includes drilling of test hole, yield test, enlarging of diameter and pump test after the construction of tube well.

Nooriabad, Jamshoro, Sindh.

SGS Pvt. Ltd

Electrical Resistivity survey

ERS with report writing, to determine the aquifer potential through the sub-surface lithological conditions, the behavior of groundwater, thickness and distribution of subsoil formations.

Hala Nakah, Hyderabad, Sindh.

Lakhani Silk Mills

Compressor Washing

Bore wash by a running compressor

Karachi, Sindh

Candy land

Tube well construction

Hub Chowki,

P.A.F Masroor

Compressing Washing

Bore wash by running compressor and pump installation

Karachi, Sindh

CTE 790 FWO

Tube Well Construction

Karachi, Sindh

Al Mehran Builders

Tube Well Construction

Karachi, Sindh

Getz Pharma

Geo-Professional

Electrical Resistivity Survey

The vertical electrical sounding of the ground at five different locations, determining subsurface lithology from 5-50m, using Schlumberger configuration.

Karachi, Sindh

K-Electric

Geo-Professional

Electrical Resistivity Survey

The vertical electrical sounding of the ground at five different locations, determining subsurface lithology from 5-50m, using Schlumberger configuration.

Karachi, Sindh

Paragon

Tube Well Construction

Karachi, Sindh

Magnum Mall

Electrical Resistivity Survey

The vertical electrical sounding of the ground at five different locations, determining subsurface lithology from 5-50m, using Schlumberger configuration.

Hyderabad, Sindh

PAF Masroor

Geo-Professional

Electrical Resistivity Survey

The vertical electrical sounding of the ground at five different locations, determining subsurface lithology from 5-100m, using Schlumberger configuration.

Karachi, Sindh

Al-Karam

Geo-professional

Electrical Resistivity Survey

The vertical electrical sounding of the ground at five different locations, determining subsurface lithology from 5-50m, using Schlumberger configuration.

Karachi, Sindh

ZEST Consultants

Geo-Professional

Electrical Resistivity Survey

The vertical electrical sounding of the ground at five different locations, determining subsurface lithology from 5-50m, using Schlumberger configuration.

Hyderabad, Sindh

Nauras

Geo-Professional

Tube Well Construction

Karachi, Sindh

Tabba Hospital

Tube Well Construction

Karachi, Sindh

Khairpur special economic Zone (KSEZ)

Geo-Professional

Electrical Resistivity Survey

The vertical electrical sounding of the ground at five different locations, determining subsurface lithology from 5-100m, using Schlumberger configuration.

Khairpur, Sindh

Karachi Golf Club (KGC)

Geo-Professional

Electrical Resistivity Survey

The vertical electrical sounding of the ground at five different locations, determining subsurface lithology from 5-100m, using Schlumberger configuration.

Karachi, Sindh

Gul Ahmed

Electrical Resistivity Survey

The vertical electrical sounding of the ground at Total 04 probe conducted at different locations, determining subsurface lithology from 2-200m, using Schlumberger configuration.

Karachi

Galaxy Pharma

Electrical Resistivity Survey

he vertical electrical sounding of the ground at Total 03 probe conducted at different locations, determining subsurface lithology from 2-200m, using Schlumberger configuration.

Karachi

Pakistan Synthetic Limited

Electrical Resistivity Survey

The vertical electrical sounding of the ground at Total 10 probe conducted at different locations, determining subsurface lithology from 2-400m, using Schlumberger configuration.

H.I.T.E, Baluchistan

Masoom Flour Mill

Electrical Resistivity Survey

The vertical electrical sounding of the ground at Total 03 probe conducted at different locations, determining subsurface lithology from 2-300m, using Schlumberger configuration.

S.I.T.E Area, Karachi

Hinglaj Mandir

Geo-Professional

Electrical Resistivity Survey

The vertical electrical sounding of the ground at Total 04 probe conducted at different locations, determining subsurface lithology from 2-500m, using Schlumberger configuration.

Kund Malir, Baluchistan

Hill Park

Electrical Resistivity Survey

The vertical electrical sounding of the ground at Total 10 probe conducted at different locations, determining subsurface lithology from 2-300m, using Schlumberger configuration.

Karachi

Atlas Honda

Tube well Construction

Karachi

SECMC (Sindh Engro Coal Mining Company)

Tube well, Injection wells, R.O plant installation.

Drilling of a various borehole with depth varies from 500ft to 700ft at Ghurano, Ehsanshah jo tar, Mutto jo Tar, Shingiaro, Rescue Center, Green Park, Muslim Para, Hindu Para and T.F Hospital.

Tharparkar, Sindh

FPCL (FFBL Power Company Limited)

Geo-Professional

Tube well Construction

Karachi

Fortune Mountain Resources Pvt. Ltd.

Electrical Resistivity Survey at Chagai, Baluchistan

The vertical electrical sounding of the ground at four different locations, 03 probes conducted at each location determining subsurface lithology from 2-500m, using Schlumberger configuration

Chagai, Baluchistan

Gawadar Cantt

Electrical Resistivity Survey at Gawadar, Baluchistan

The vertical electrical sounding of the ground at Total 16 probe conducted at Seven different locations, 03 probes conducted at each location determining subsurface lithology from 2-500m, using Schlumberger configuration

Gawadar, Baluchistan

Denim-E Clothing

Electrical Resistivity Survey and Tube Well Construction

Karachi

APAG Oil Pvt. LTD.

Electrical Resistivity Survey and Tube Well Construction

Karachi

Advance Metal PVT. LTD

Electrical Resistivity Survey and Tube Well Construction

Hub

Baluchistan Development Authority (BDA)

Electrical Resistivity Survey at Ship Breaking Yard, Gaddani, Baluchistan

The vertical electrical sounding of the ground at Total 05 probe conducted at different locations, determining subsurface lithology from 2-400m, using Schlumberger configuration

Gaddani, Baluchistan

Buksh Dyeing

Tube well construction

Karachi, Sindh

Indus Pharma

Compressor Washing

Bore wash by the running compressor

Karachi, Sindh

Al-Abbas

Tube well construction

Karachi, Sindh

KESZ

Tube well construction

Khairpur

Meezan Beverage

Tube well construction

Karachi, Sindh

B.L. Harbert International.

Tube Well Construction at U.S Embassy

Islamabad

Sindh Engro Coal Mining Corporation

Coal Reservoir Budgeting and Estimation of Thar Block II

Drilling of 56 boreholes of HQ core drilling up to 220m to 280m for coal estimation, through geological and geophysical data collection and interpretation

THAR Block II

Garrison Engineer

WATER SUPPLY SCHEME (PH-01) CA NO DW&CE, SPD/41/2018, NOORIABAD, NEAR DHA CITY.

Nooriabad, Near DHA City.

Thar Foundation Hospital

Tube well Construction

Tharparkar, Sindh

HS Crete

Tube well Construction

Ghaghar Phatak, Karachi

Shafi Glucochem

Tube well Construction

H.I.T.E, Baluchistan

Siddiqsons Tin Plating

Tubewell Construction

Hub, Baluchistan

Matrix Pharma

Dewatering well

Drilling of 50ft. production well and 02 piezometer well up to 40ft. Long Pump test for the model assumption.

Korangi Industrial Park, Karachi

Gumcorp

Tube well Construction

Port Qasim, Karachi.

Iqbal Dyeing, DCC

Tube well Construction

Korangi, Karachi

Karachi Club

Tube well Construction

Karachi

Shangrilla Pvt. Ltd.

Tube well Construction

Gulshan-E-Maymar, Karachi.

Amcorp-Kadanwari

Tube well construction

Karachi.

Qadri Noori Enterprises Fisheries

03 Tube well Construction

Drilling of 03 boreholes up to 700ft. depth. Installation of casing up to 700ft., gravel packing and bore washing by a submersible pump.

Fisheries, Karachi

Nabi Qasim Industries (Pvt) Ltd

Tube Well Construction

Korangi, Karachi

Denim Clothing Company

02 Tube well Construction

Korangi, Karachi

Reckitt Benckiser

Electrical Resistivity Survey Tube Well Construction

S.I.T.E, Karachi

Classic Flour Mills

Electrical Resistivity Survey

The vertical electrical sounding of the ground at Total 04 probe conducted at different locations, determining subsurface lithology from 2-300m, using Schlumberger configuration.

Karachi

Sunrise Plastic Industris (PVT.) LTD

Enerzone Engineering Services

Electrical Resistivity Survey Tube Well Construction at Sunrise Plastic

Rahim Yar Khan Industrial Estate, Punjab

Shahnawaz Coorporative Housing Society

Geo-Professional

Electrical Resistivity Survey

The vertical electrical sounding of the ground at Total 06 probe conducted at different locations, determining subsurface lithology from 2-400m, using Schlumberger configuration.

Gulshan-E-Maymar, Karachi.

RO Plant

Geo-Professional

Electrical Resistivity Survey

The vertical electrical sounding of the ground at Total 04 probe conducted at different locations, determining subsurface lithology from 2-500m, using Schlumberger configuration.

Javed Bahria Housing Society, Karachi

Security Paper Limited

Electrical Resistivity Survey

The vertical electrical sounding of the ground at Total 10 probe conducted at different locations, determining subsurface lithology from 2-300m, using Schlumberger configuration.

Malir, Karachi

Pakistan Cable Ltd.

Electrical Resistivity Survey

The vertical electrical sounding of the ground at Total 04 probe conducted at different locations, determining subsurface lithology from 2-300m, using Schlumberger configuration.

Nooriabad

YKK Zip Company

Electrical Resistivity Survey

The vertical electrical sounding of the ground at Total 05 probe conducted at different locations, determining subsurface lithology from 2-400m, using Schlumberger configuration.

Export Processing Zone, Karachi

Denim Clothing Company DCC

Electrical Resistivity Survey

The vertical electrical sounding of the ground at Total 02 probe conducted at different locations, determining subsurface lithology from 2-500m, using Schlumberger configuration.

Korangi, Karachi

Burj Builders and Developers

Geo-Professional

Electrical Resistivity Survey

The vertical electrical sounding of the ground at Total 03 probe conducted at different locations, determining subsurface lithology from 2-150m, using Schlumberger configuration.

Saddar City, Karachi

NS Property and Network

Electrical Resistivity Survey

The vertical electrical sounding of the ground at Total 03 probe conducted at different locations, determining subsurface lithology from 2-300m, using Schlumberger configuration.

Maripur, Karachi

MEDECINS SANS FRONTIERES INTERNATIONAL (MSF).

Electrical Resistivity Survey

The vertical electrical sounding of the ground at Total 05 probe conducted at different locations, determining subsurface lithology from 2-500m, using Schlumberger configuration.

Machar Colony, Karachi

Aquagen Pvt. Ltd. (APL)

Electrical Resistivity Survey

The vertical electrical sounding of the ground at Total 03 probe conducted at different locations, determining subsurface lithology from 2-300m, using Schlumberger configuration.

PNS Karsaz, Karachi

National Food Ltd. (NFL)

Electrical Resistivity Survey

The vertical electrical sounding of the ground at Total 06 probe conducted at different locations, determining subsurface lithology from 2-30m, using Wanner configuration for earthing Bore

Port Qasim, Karachi

Hui Feng International Trade Private Ltd.

Electrical Resistivity Survey

The vertical electrical sounding of the ground at Total 04 probe conducted at different locations, determining subsurface lithology from 2-400m, using Schlumberger configuration.

Moach Goth, Karachi

Crete One

Electrical Resistivity Survey

The vertical electrical sounding of the ground at Total 03 probe conducted at different locations, determining subsurface lithology from 2-200m, using Schlumberger configuration.

Murad Memon Goth, Karachi

Martin Dow

Electrical Resistivity Survey Tube Well Construction at Martin Dow

Korangi, Karachi

Karachi International Container Terminal (KICT)

Tube Well Construction at KICT

Dockyard, Karachi

Al-Parveen Paper Mill LTD.

Geo-Professional

Electrical Resistivity Survey

The vertical electrical sounding of the ground at Total 03 probe conducted at different locations, determining subsurface lithology from 2-400m, using Schlumberger configuration.

Kotri Industrial Area, Sindh

Clarient Chemical Pakistan PVT. LTD

Electrical Resistivity Survey

The vertical electrical sounding of the ground at Total 04 probe conducted at different locations, determining subsurface lithology from 2-120m, using Schlumberger configuration.

Korangi, Karachi

Soorty Enterprises PVT. LTD

Electrical Resistivity Survey

The vertical electrical sounding of the ground at Total 03 probe conducted at different locations, determining subsurface lithology from 2-500m, using Schlumberger configuration.

Korangi, Karachi

Burj Builders and Developers

Geo-Professional

Electrical Resistivity Survey

The vertical electrical sounding of the ground at Total 03 probe conducted at different locations, determining subsurface lithology from 2-150m, using Schlumberger configuration.

Saddar City, Karachi

Let Us Implement And Manage Your Water Solution!