Project Partner
Client
Sub Contract By
Project
Description
Area
Mustaqeem Dyeing & Printing Industries PVT. LTD.
Geotechnical Investigation Report for Spining Mills Plot # A-240
Three (03) boreholes up to 10.0m were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
Nooriabad
Bahria Town
----
Geotechnical Investigation of Phase 2
3 holes of 15m 13 holes of 5m
Bahria Town Karachi
Pir Heaven
----
Geotechnical Investigation for G+4 Apartment
Four (04) holes were drilled, 20 m depth of each hole, laboratory testing & report writing.
PIB Colony, Karachi.
Altaf Hussain University
----
Geotechnical Investigation for Altaf Hussain University, Hyderabad.
Ten (10) holes were drilled, 20 m depth of each hole, laboratory testing & report writing.
Hyderabad
Engro
----
Soil Investigation of Vajihar Reservoir
7 holes of 150m 4 pits 3*3m 4 FDT & electric resistivity survey.
Vajihar, Islam Kot
Pak Agro Chemical
----
Soil Investigation of Cylos
Drilled two boreholes of 20.0m depth
Port Qasim, Karachi.
Meezan Beverages
----
Soil Investigation for Underground Water Tank
----
Lahore
Sufi Khalid
----
Soil Investigation of plots at Sandspit
10 holes of 11m
Sands Pit, Karachi.
NEC
SUPARCO
Geotechnical Investigation
Drilling work for Environmental site Assessment at Suparco which includes drilling, sampling, preparation of log, preservation of samples for VOCS, Non-VOCS and other chemical characteristics and finally comprehensive report writing
Korangi Industrial Area, Karachi, Sindh.
ADH
----
Geotechnical Investigation
Askari V Karachi, Sindh
ADH
----
Geotechnical Investigation
30-SU Houses 4 blocks of G+ 3 apartments, complete Soil Investigation, Laboratory testing, report writing includes foundation recommendations, bearing capacity calculations.
Askari-IV Karachi, Sindh
Railway
Pacific engineering
Geotechnical Investigation for railway track bin Qasim to Port Qasim.
Eighteen boreholes were drilled, depth varies from 12 to 22.0 m depth, Plate load test up to 10 TSF
Port Qasim, Karachi.
Mehran Marmi Pvt Ltd.
----
Core drilling of NQ size
Drilling of 35 nos. of core hole for petro-physical and petrochemical analysis of Limestone query at various palaces of Baluchistan i.e. Khuzdar for Black and Gold, Bella for Golden marble, Nushki region for Travertine and Karaak Baluchistan for Tipi and Fancy Marble
Khuzdar, Bella, Nuhski, Karaak, Baluchistan
Abdullah Mining
J.V with Subzazar
Core drilling of HQ size
Drilling of 4 nos, holes for coal cores which includes drilling, preservation, labeling of cores, provision of core boxes, geophysical logging
Lakra, Sindh
Sindh Coal Authority
Subzazar Pvt Ltd.
Core drilling of HQ size
Drilling the 8 nos. core drill of HQ size up to 700ft to 1000ft includes drilling, preservation, labeling of cores, provision of core boxes, geophysical logging
Sonda, Sindh
Baluchistan Constructors Pvt. Limited
----
Geotechnical Investigation of Dam-2A, Percolation Pond, Gorano-Sindh
Two boreholes of 25-m depth were drilled for soil investigation. Two auger holes of 15-m depth were drilled for the permeability test. In situ collapse potential test, Collapse Potential Test in Lab, vibrating Table test.
Islamkot Tharparker Sindh
Baluchistan Constructors Pvt. Limited
----
Geotechnical Investigation of Dam-2B, Percolation Pond, Gorano-Sindh
Two boreholes of 25-m depth were drilled for soil investigation. One auger hole of 15-m depth was drilled for permeability test by falling head method & constant head method, Collapse Potential Test, vibrating Table test
Islamkoht Tharparker Sindh
315 MEB
----
Geotechnical Investigation for Karachi Institute of Medical Sciences, Malir Cantt Karachi.
Eighteen boreholes were drilled. Sixteen boreholes of 20-ft depth and two boreholes of 30-ft depth.
Malir Cantt Karachi
ADH Works, (DAD -I)
----
Geotechnical Investigation for SU Houses No. 01-10, 35-44, 66-73, 96-125, 151-190, Masjid, Over Head Water Tank and Shop at Sector-H, Askari-V, Malir Cantt Karachi.
Two Hundred and three (203) boreholes were drilled.
Malir Cantt Karachi
ADH Works, (DAD - III)
----
Geotechnical Investigation for Block 55, 116, 117 & 118, G+9, Sector-B, Askari-V, Malir Cantt Karachi.
Fourteen (14) boreholes were drilled.
Malir Cantt Karachi
Railway
Pacific engineering
Geotechnical Investigation for railway track bridge.
Three holes were drilled up to 20.0 m each
Dhabeji
Futehally Chemicals (Pvt) Ltd
----
Geotechnical Investigation of Plot # W2/8, Futehally chemicals (Pvt.) Ltd, Port Qasim
Drilled six (06) boreholes up to 50.0 ft. depth and recommended bearing capacities and type of foundations
Karachi
DHA Multan
----
Geotechnical Investigation of Sector-B, C & D for Road Construction at DHA Multan
Excavated twenty-one (21) test pits in sector B, C and D, complete lab testing, report writing & recommendation of modulus of subgrade reaction.
Multan
Cost Veyor
----
Geotechnical Investigation of development in literacy, J-6 School, Rehmat Chowk, Orangi Town, Karachi
Drilled two (02) boreholes up to 30.0 ft. depth, complete lab testing and recommend bearing capacities.
Karachi
Sachal Engineering Works Pvt. Limited
----
Geotechnical Investigation of Evaporation Pond Lot-I and JPCL Channel Lot-II
Ten (10) boreholes up to 5.0m in Lot-I and II, performed complete lab testing, and recommend bearing capacities.
Jamshoro
ICC and MAJ
----
Geotechnical Investigation of Office block and Landfill area, Lot-III, Jamshoro
Thirteen (13) boreholes up to 5.0m, performed complete lab testing, and recommend bearing capacities.
Jamshoro
Karachi Water & Sewerage Board
----
Geotechnical Investigation for Greater Karachi Bulk Water Supply Scheme, K-IV, Phase-II
Forty (40) boreholes were drilled. Four boreholes of 125-ft depth, Seven boreholes of 50-ft depth and twenty-nine boreholes of 15-ft depth.
Jhampir, Thatta to Gadap Town Karachi (118 Km)
State Bank of Pakistan (SBP)
----
Geotechnical Investigation for New SBP Building at DI Khan KPK.
Five boreholes were drilled. Three boreholes of 15-m depth and two boreholes of 20-m depth.
Dera Ismail Khan KPK
China Gezhouba Group Company Limited
----
Re Geotechnical Investigation of Wind Turbine WTG_57
Geotechnical Investigation Holes of 20.0 m depths, recommendations of bearing Capacity
Jhampir area
Shaheen Foundation
----
Geotechnical Investigation for 50MW Wind Power Project by Shaheen Foundation, PAF at Bholari, District Thatta Sindh
Ten (10) boreholes were drilled. Seven boreholes of 20-m depth and three boreholes of 10-m depth & Electric resistivity survey (10 probes)
Bholari, District Thatta Sindh
Shaheen Foundation
----
Geotechnical Investigation of Falcon Shopping Mall, PAF Base Faisal, Karachi
Five Boreholes were drilled. Four boreholes of 60-ft depth and one borehole of 100-ft depth.
PAF Base Faisal Karachi
Bahria University
----
Geotechnical Investigation for Proposed Block Extension at Bahria University Karachi Campus.
Five (05) boreholes were drilled. Each having 60-ft depth.
Bahria University Karachi Campus
Mehran Enterprises
----
Geotechnical Investigation at Cliff Vista Gulistan-e-Johar, Karachi.
Two boreholes were drilled. One borehole of 40-ft depth and another of 25-ft depth.
Gulistan-e-Johar Karachi
Khalid Mushtaq Motors
----
Geotechnical Investigation of Plot No. A-330, Nooriabad.
Three boreholes were drilled. Each of 10-m depth.
Nooriabad
Mr. Kashif Illyas
----
Geotechnical Investigation at A-357, Block 6A, Mehran Town, Korangi Karachi.
Two boreholes were drilled. Each having 65-ft depth.
Mehran Town, Korangi Industrial Area, Karachi
Fauji Fertilizer
East West Infiniti
Geotechnical Investigation for Construction of Wind Met Mast B at Jhampir, District Thatta Sindh.
One borehole of 30-m depth was drilled.
Jhampir, District Thatta Sindh
Pakistan Cables Ltd.
Al-Hadeed Engineering
Geotechnical Investigation of Pakistan Cables Limited, Site Area Karachi.
Six boreholes were drilled. Two boreholes of 50-ft depth and four boreholes of 40-ft depth.
SITE Area, Karachi
Sachal Engineering Works Pvt. Limited
----
Geotechnical Investigation of Badin to Mithi Road for Bridge Construction. (RD # 4+311.50m)
Two boreholes of 35-m depth were drilled.
District Badin
Baluchistan Constructors Pvt. Limited
----
Geotechnical Investigation of Dam-1A, Percolation Pond, Gorano-Sindh
Two boreholes of 25-m depth were drilled for soil investigation. Two auger holes of 15-m were drilled for the permeability test.
Islam kot Tharparker Sindh
BAHRIA TOWN
----
Final Geotechnical Investigation Report For Eight Marla Home, Precinct-23A, Bahria Town Karachi.
Seventeen (17) boreholes up to 10.0m depth were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
KARACHI
ENVISION ENGINEERING
----
Geotechnical Investigation for Islamkot, Tharparkar Sindh.
Complete lab results are included in the report.
THAR, SINDH
SEPCO
----
Geotechnical Investigation report for construction of 132kv SDT Transmission line, new Rohri 132/220kv grid station Sukkur site.
Fifteen (15) boreholes up to 10.0m to 35.0m depth were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
SUKKUR
LT. COL. RAFIQUE KHATTAK
----
Five (05) boreholes up to 33.0-ft depth were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
TURBAT
S.G. ARCHITECT & URBAN DESIGNER
----
Geotechnical Investigation report for Cadet College, Turbat Baluchistan.
Ten (10) boreholes up to 30.0-ft depth were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
TURBAT
Bahria University Karachi
----
Geotechnical investigation for proposed library blocks ext. & academic block at Bahria University, Karachi.
Three (03) boreholes including, One (01) up to 70.0 ft. One (01) up to 100 ft. and One (01) up to 80.0 ft. depth was drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
Karachi
Omni Motorsport Pvt. Ltd.
----
Geotechnical investigation report for airmen Golf course & recreation park, Karachi
Drilled four (04) boreholes up to 40 ft. depth & Six (06) test pits of 5.0 ft. depth, complete lab testing, and report writing & recommendations of bearing capacity
Karachi
M/S Maqbool & Zarghoon JV.
----
Geotechnical investigation for improvement & widening of qila saifullah-loralai-waigum road section,brdge at rd 113+937, 123+184.35, 108+225, 84+590& 128+057. N-70.
Drilled Nine (09) boreholes up to 30 m. depth, complete lab testing, and report writing & recommendations of pile capacities on several depth and dia.
Qila Saifullah Loralai, Balochistan.
Fazaia Housing Scheme, Karachi
SFETIC
Two (02) test were performed up to 1600 KPa test load and determine the Net settlement of the area
Karachi.
Scheme Karachi, Site-01
SEPCO
----
Geotechnical Investigation report for construction of 132kv SDT Transmission line, new Rohri 220/132kv grid station Sukkur site 132kv grid station from location no. 01 (loose point) to location no.74 (loose point).
Fifteen (15) boreholes including, five (05) up to 15.0m, four (04) up to 20.0m, four (04) up to 10.0m, one (01) up to 35.0m and one (01) up to 25.0m depth were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
KARACHI
BAIG METAL CRAFTS
----
Final Geotechnical Investigation Report Of Plot# H-160 / Z-24, S.I.T.E, Super Highway, Karachi.
Three (03) boreholes up to 50.0-ft depth were drilled, complete lab testing and recommend bearing capacities.
KARACHI
SECMC
----
Geotechnical Investigation Report for Construction of Tower-06 & Tower-07, Coal Handling System for Open Cast Lignite Mine at Thar Block-II.
Five boreholes (05) up to 20.0m depth were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
Thar, Sindh
SAIMA REAL ESTATE
----
Report For Pile Load Test On Plot No. Com-3, Saima Downtown, Hyderabad.
Report writing & recommendations of pile capacities on several depth and dia.
HYDERABAD
HOME BUILDER AND DEVELOPERS
----
Report for pile load test on test Pile at plot # 477-B, main national highway opp. Sindh museum, Qasimabad, Hyderabad, Sindh.
Report writing & recommendations of pile capacities on several depth and dia.
HYDERABAD
FAZAIA HOUSING SCHEME KARACHI
----
Total of two numbers of Plate Load Tests was carried out at the site.
KARACHI
M/S AMZED TEXTILE
----
Final Geotechnical Investigation Report of Plot # F/753, Site Area, Karachi.
Two (02) boreholes up to 30.0-ft were drilled, complete lab testing and recommend bearing capacities.
KARACHI
TAI BROTHERS ASSOCIATES
----
Geotechnical Investigation Report for Roltus Industries at Plot# E-94, North West Industrial Zone, Karachi.
Three (03) boreholes including two boreholes (02) up to 30.0-ft & (01) up to 40.0-ft depth were drilled, were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
KARACHI
DESCON ENGINEERING LIMITED
----
Geotechnical investigation report of PMO office and residency for Guddu barrage project.
Three (03) boreholes including two boreholes (02) up to 15.0m& (01) borehole up to 10.0m depth were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
SINDH
Q & Q FOOD INDUSTRIES
----
Geotechnical Investigation at Q & q food industries, Karachi.
Five (05) boreholes including one up to 100.0-ft, two up to 50.0- ft. & two up to 30.0-ft were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
KARACHI
SEPCO
----
Geotechnical Investigation report for construction of 132kv double circuit line feed for Ratodero grid station in and out from 32kv double circuit line feed, Lodra, Larkana transmission line.
Three boreholes (03) including one (01) up to 20.0m & two (02) up to 15.0m was drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
LARKANA
S.M ENTERPRISES
----
Final Geotechnical Investigation Report of shell warehouse, Port Qasim, Karachi.
Three boreholes (03) including two (02) up to 40.0-ft & one up to 100.0-ft were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
KARACHI
JAWWAD INDUSTRIES
----
Final Geotechnical Investigation report for plot # F/2-Z/3, Site Area, Karachi.
Two boreholes up to 50.0-ft were drilled, including report writing, recommendations of bearing capacity & foundations.
KARACHI
ASIAN DEVELOPMENT BANK
----
Geotechnical Investigation Report for Construction & Improvement of Bridge At RD#44+230, ICB-SPRIP-04 Sanghar To Mirpurkhas Section.
One (01) borehole was drilled up to 40.0m depth, including report writing, recommendations of bearing capacity & foundations.
MIRPURKHAS
SECMEC
----------
Investigation holes and coring of HQ size
Drilling of 56 nos. core drill of HQ size up to 200 m to 250 m includes drilling, preservation, labeling of cores, provision of core boxes, geophysical logging
Islamkot, Tharparkar
Mustaqeem Dyeing & Printing Industries PVT. LTD.
Geotechnical Investigation Report for Spining Mills Plot # A-240
Three (03) boreholes up to 10.0m were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
Nooriabad
Diamond Enterprises PVT. LTD.
Geotechnical Investigation for Plot # F 2, Eastrian Industrial Zone
Six (06) borehole upto 10.0m were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
Port Qasim Karachi
Kompass Pakistan
Geotechnical Investigation for plot # W2/48 Kompass Pakistan
Four (4) Borehole from which 02 bore up to 50 ft. 01 bore upto 30ft. And 01 bore upto 22ft. were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
Port Qasim Karachi
Shangrila PVT. LTD.
Geotechnical investigation Report of Plot # 94
Four (04) boreholes up to 15.0m were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
Gulshan-e-Maymar, Karachi
ASF Foundation
----
Geotechnical Investigation Report for Contruction of main Bulevard Package 03 Bridge, Construction Ph-01, ASF City Karachi.
Four (04) boreholes up to 35.0m were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
ASF City, Karachi
Xinjang beixin road & bridge group co. Ltd.
GEOTECHNICAL INVESTIGATION REPORT FOR CONSTRUCTION OF ADDITIONAL 2-LANE CARRIAGE WAY (Bridge-01, 02, 03 & 04) from Petaro to Sehwan N55.
Nine (09) boreholes were drilled up to 35 m to 45m depth including 04 borehole at bridge 01, 02 boreholes at bridge 02 & 03 and 01 borehole at bridge 04, Complete Lab Testing, and Report writing, recommendations of bearing capacity, pile capacity & foundations.
Sehwan
Gravity One
Al-Qazi Constructors Civil & Piling Works
Report of Pile Load Test for Gravity One on Plot Com-14&15, Block 04 Scheme 05, Kahkashan Clifton.
Report writing & recommendations of pile capacities on several depth and dia.
Karachi
ASF Foundation
Geotechnical investigation report for ASF academy near airport, Karachi
Drilled Total Ten (10) boreholes, five boreholes up to 6.0m & five boreholes up to 10.0m depth, Complete Lab Testing, Report Writing, and Recommendation of Bearing Capacity & Foundation.
Karachi
Hybrid Technics (Pvt.) Limited
Geotechnical Investigation Report of Hi-Tech Metals Special Economic Zone (Pvt.) Limited, Dhabeji, Thatta
Drilled a total 06 borehole up to 10.0m, complete lab testing, report writing, recommendations of bearing capacity & Foundation.
Dhabeji, Thatta
Malik Textile Industries (Pvt.) Limited
Geotechnical Investigation Report for Malik Textile Industries at Plot # L-30, Block-22, F.B Area Karachi
Drilled 04 borehole one bore up to 15.0m, one bore up to 10.0m and two bore up to 12.0m depth. Complete Lab, Testing, Report Writing, the recommendation of Bearing Capacity and foundation
Karachi
Directorate of Housing
Geotechnical Investigation Report for I.H House # 340, 342, 344, 346, 348, 350, 352, 354, 356 to House # 391 at AFOHS, New Malir, Karachi
Drilled 86 borehole 02 boreholes was drilled at each plot, complete lab testing, and Report Writing, the recommendation of bearing capacity & foundation of each plot.
Karachi
DHA MULTAN
----
Final Geotechnical investigation of sector-B, C and D at DHA Multan.
Six (06) to eight (08) test pits were excavated Field density test performed, lab testing, and report writing.
DHA MULTAN
MUQEET GHEE (PVT.) LIMITED
----
Final Geotechnical Investigation report of plot# A-15, Muqeet ghee (PVT.) Limited. Karachi.
Three (03) boreholes including, two (02) up to 10.0-ft and one (01) up to 20.0-ft depth were drilled, Complete lab testing, and report writing, recommendations of bearing capacity & foundations.
KARACHI
LOCAL GOVT. DEPT. (KDA) GOVT. OF SINDH.
----
Final Geotechnical Investigation report of the overhead water tank at Jaffar Tayyar Society, Near Imamia Imam Bargah, Karachi.
One (01) boreholes up to 100.0-ft depth was drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
KARACHI
ARMY DIRECTORATE HOUSING (ADH)
----
Geotechnical Investigation report for 04-Bed Apartment, (1b+G+8)-Story, Block-01, Block-02, Block-03, Block-13 & Block-14, DHA city, Karachi.
Twenty (20) boreholes upt0 60.0-ft to 100.0-ft depth were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
KARACHI
Directorate of Housing
Geotechnical Investigation Report for I.H House # 340, 342, 344, 346, 348, 350, 352, 354, 356 to House # 391 at AFOHS, New Malir, Karachi
Drilled 86 borehole 02 boreholes was drilled at each plot, complete lab testing, and Report Writing, the recommendation of bearing capacity & foundation of each plot.
Karachi
DHA MULTAN
Final Geotechnical investigation of sector-B, C and D at DHA Multan.
Six (06) to eight (08) test pits were excavated Field density test performed, lab testing, and report writing.
DHA MULTAN
MUQEET GHEE (PVT.) LIMITED
Final Geotechnical Investigation report of plot# A-15, Muqeet ghee (PVT.) Limited. Karachi.
Three (03) boreholes including, two (02) up to 10.0-ft and one (01) up to 20.0-ft depth were drilled, Complete lab testing, and report writing, recommendations of bearing capacity & foundations.
KARACHI
LOCAL GOVT. DEPT. (KDA) GOVT. OF SINDH.
Final Geotechnical Investigation report of the overhead water tank at Jaffar Tayyar Society, Near Imamia Imam Bargah, Karachi.
One (01) boreholes up to 100.0-ft depth was drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
KARACHI
ARMY DIRECTORATE HOUSING (ADH)
Final Geotechnical Investigation report for Su House no. 01 to SU House no. 72 at DHA city, Karachi.
One hundred and forty-four (144) boreholes up to 20.0-ft depth were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
KARACHI
Sindh Revenue land Department
ULSC
Topographical mapping, matching boundaries, GIS mapping, Land demarcation, estimation of different nature of lands, land layout and report compiling
Topographical mapping, matching boundaries, GIS mapping, Land demarcation, estimation of different nature of lands, land layout and report compiling done for Sindh land department with ULSC.
Karachi, Sindh.
Mehran Marmi Pvt Ltd.
Coe drilling of NQ size
Drilling of 35 nos. of core hole for petrophysical and petrochemical analysis of Limestone query at various palaces of Baluchistan i.e. Khuzdar for Black and Gold, Bella for Golden marble, Nushki region for Travertine and Karaak Baluchistan for Tipi and Fancy Marble
Khuzdar, Bella, Nuhski, Karaak, Baluchistan
Abdullah Mining
J.V with Subzazar
Coe drilling of HQ size
Drilling of 4 nos, holes for coal cores which includes drilling, preservation, labeling of cores, provision of core boxes, geophysical logging
Larkana, Sindh
Buksh Industries
Construction of Tube well
Construction of tube well up to 1000ft deep for water supply has done which includes, drilling of investigation hole, hydrogeological study, yield test, conversion into tube well by enlarging the investigation hole diameter from 8” to 16”, provision and lowering of casing and silica gravel packing followed to pump test for confirmation of water quality and quantity and last a comprehensive report writing.
North Karachi Industrial Area, Karachi, Sindh.
LBOD, SIDA
Madni Engineering Construction Company
Hydrogeological Investigation
Electrical Resistivity Survey to determine the subsurface resistivity distribution by making measurements on the ground surface to delineate the aquifers, study the sub-surface lithological conditions and behavior of groundwater such as lithological nature of different subsurface formations by means of 5 test hole, these test holes was geophysical (Spontaneous potential, Natural Gamma, Single point resistance and caliper) and geological log by Logging tool, thickness and lateral extent of subsoil formations have been marked by correlating the hole from 00Rd to 75RD by help of Rockware and Logplot software. Long pump test for measuring the drawdown and cone of depression, Last to examine the groundwater potential and submitted a comprehensive recommendation and analyzed report to the client.
Nabisar, Thar, Sindh.
Sapphire
Consolidate Engineering Services
2d Electrical Resistivity Profiling For Characterization Of Subsurface Lithology
2D electrical resistivity profiling in Jhampir was conducted for identification of fracture zones in the subsurface in the area needed for the design of basement of wind turbine power plant. The report presents the findings of the Electrical Resistivity Survey conducted using the 2D resistivity profiling technique at each WTG location suggested by the client.
Jhampir Area
Sindh Irrigation And Drainage Authority
Madni Engineering Construction Company
Installation of piezometer
Re-installation of 49 nos. of piezometer includes at Kotri Barrage, river Indus at several bays at end of pavements and toe of glaci, preparation of barrages for offshore drilling by means of rig and pontoons, arrangement of ships for locomotion, drilling of 500ft drilling, sampling, provision of material of geotextile, casing, pea gravel, preparing the transitory embankments by bunny bags, laying of cable till roof, connecting piezometers with multiplexers and report writing
Kotri Barrage, Jamshoro, Sindh.
Mustaqeem Dyeing & Printing Industries PVT. LTD.
Geotechnical Investigation Report for Spining Mills Plot # A-240
Three (03) boreholes up to 10.0m were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
Nooriabad
Diamond Enterprises PVT. LTD.
Geotechnical Investigation for Plot # F 2, Eastrian Industrial Zone
Six (06) borehole upto 10.0m were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
Port Qasim Karachi
Kompass Pakistan
Geotechnical Investigation for plot # W2/48 Kompass Pakistan
Four (4) Borehole from which 02 bore up to 50 ft. 01 bore upto 30ft. And 01 bore upto 22ft. were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
Port Qasim Karachi
Shangrila PVT. LTD.
Geotechnical investigation Report of Plot # 94
Four (04) boreholes up to 15.0m were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
Gulshan-e-Maymar, Karachi
ASF Foundation
Geotechnical investigation report for ASF academy near airport, Karachi
Drilled Total Ten (10) boreholes, five boreholes up to 6.0m & five boreholes up to 10.0m depth, Complete Lab Testing, Report Writing, and Recommendation of Bearing Capacity & Foundation.
Karachi
BAHRIA TOWN
Construction of Transmission Line from New Sabzi Mandi grid station to new Bahria grid station, Karachi (Part-2 Borehole # 18, 19, 22 to 28, 39 & 40)
Fourteen (11) boreholes including eight (08) up to 15.0m & six (06) up to 10.0m were drilled, complete lab testing, and report writing, recommendations of bearing capacity & foundations.
KARACHI
Xinjang beixin road & bridge group co. Ltd.
GEOTECHNICAL INVESTIGATION REPORT FOR CONSTRUCTION OF ADDITIONAL 2-LANE CARRIAGE WAY (Bridge-01, 02, 03 & 04) from Petaro to Sehwan N55.
Nine (09) boreholes were drilled up to 35 m to 45m depth including 04 borehole at bridge 01, 02 boreholes at bridge 02 & 03 and 01 borehole at bridge 04, Complete Lab Testing, and Report writing, recommendations of bearing capacity, pile capacity & foundations.
Sehwan
Gravity One
Al-Qazi Constructors Civil & Piling Works
Report of Pile Load Test for Gravity One on Plot Com-14&15, Block 04 Scheme 05, Kahkashan Clifton.
Report writing & recommendations of pile capacities on several depth and dia.
Karachi
Hybrid Technics (Pvt.) Limited
Geotechnical Investigation Report of Hi-Tech Metals Special Economic Zone (Pvt.) Limited, Dhabeji, Thatta
Drilled a total 06 borehole up to 10.0m, complete lab testing, report writing, recommendations of bearing capacity & Foundation.
Dhabeji, Thatta
Malik Textile Industries (Pvt.) Limited
Geotechnical Investigation Report for Malik Textile Industries at Plot # L-30, Block-22, F.B Area Karachi
Drilled 04 borehole one bore up to 15.0m, one bore up to 10.0m and two bore up to 12.0m depth. Complete Lab, Testing, Report Writing, the recommendation of Bearing Capacity and foundation
Karachi
Nestle
Schlumberger
Video Logging of Tube Well
Video Logging, disinfection of tube well, cleaning and development of Tube Well up to 1350ft deep at DW-11 at Nestle Port Qasim Water Factory.
Port Qasim, Karachi, Sindh.
Subzazar Pvt. Ltd
Rahim Dying Pvt. Ltd.
Construction of Tube well
Work done for water supply by means of drilling work up to the 700ft deep, complete study of the aquifer, its zoning and demarcation, enlarge the diameter of the drilled hole, design of tube well according to aquifer achieve, lowering of casing and shrouding of well.
Site Industrial Area, Karachi, Sindh.
MCC resource Development Limited
Checking the inclination of the tube well
Running the plumb line method and box method for measuring verticality of well no. 1, 3 and 5, cleaning and commission of tube well no. 5 at MRDL Saindak project.
Tehlab, Taftan, Baluchistan
National Foods
Construction of Tube well
Completion of tube well of 500ft deep by the process of investigation drilling, complete aquifer study, yield test, borehole conversion into tube well by enlarging borehole diameter, lowering of casing and gravel packing, proceed by pump test for water quantity and quality and finally submission of the report.
Site Industrial Area, Karachi, Sindh.
Synohydro China
Diamond Drilling Associates
Construction of Tube well
Work done for water supply by means of drilling work up to the 700ft deep, complete study of the aquifer, its zoning and demarcation, enlarge the diameter of the drilled hole, design of tube well according to aquifer achieve, lowering of casing and shrouding of well.
Darawat Dam, Jamshoro, Sindh.
Karachi Golf Club
SGS
Drilling for monitoring well
Drilling for 3 nos. monitoring wells for measuring the water level by means of 1ft total drilling, provision and installation of casing and gravel and construction of well cape and bore plates.
Karachi Golf Club, Karsaz, Karachi, Sindh.
GETZ Pharma/ FND
Geo Professional
Electrical Resistivity Survey
Electrical Resistivity Survey for delineation of water aquifer and water potential, soil resistivity survey by means of Wenner array to demarcation the best suitable depth for proper earthling work.
Korangi Industrial Area, Karachi, Sindh.
NEC
SUPARCO
Environmental Site Assessment
Soil Investigation/ drilling work for Environmental Site Assessment at Johnson & Johnson Pakistan which includes drilling, sampling, preparation of log, preservation of samples for VOCs, Non-VOCs and other chemical characteristics and finally comprehensive report writing.
Korangi Industrial Area, Karachi, Sindh.
Toyota Society Motors
Geo professionals
Electrical Resistivity Survey
Determined the subsurface resistivity distribution by making measurements on the ground surface to delineate the aquifers, the sub-surface lithological conditions and behavior of groundwater such as lithological nature of different subsurface formations, thickness and lateral extent of subsoil formations.
Khalid Bin Waleed Road, Karachi, Sindh.
D.G Khan Cement
Hashim & Co.
Construction of Tube well
Completion of 600 feet tube well by the process of investigation drilling, complete aquifer study, yield test, geophysical logging (Gamma Gamma, Spontaneous potential, Natural Gamma, Single point resistance and caliper) borehole conversion into tube well by enlarging borehole diameter, lowering of casing and gravel packing, proceed by pump test for water quantity and quality and finally submission of report.
Winder, Baluchistan
Tobishima
Construction of Tube well
Finalized the tube well by the supervision of hydrogeologist and with the help of skilled labor, drilled investigation borehole, worked out for aquifer’s potential it's marking and zoning, conversion of borehole into tube well, lowering of casing and gravel packing, pump test and report writing.
Steel Mill, Port Qasim, Karachi, Sindh.
Corrubox
Construction of Earthing hole
Drilling 240ft, of hole 2 nos for Earthing and Installation of anode, copper wire, backfilling of earthing powder along with lime, choke and coal for better working of earthing.
Gagghar Phatak, Port Qasim, Karachi, Sindh.
Habib Rafiq Pvt Ltd.
Osmani Consultant
Geophysical Logging
Dismantling of installed submersible pump and Geophysical Logging (Gamma ray, Spontaneous potential, Natural Gamma, Single point resistance and caliper) for water well exploration for sand bed recognition and stratigraphic identification and the rank, quality, and its thickness, again installation and commissioning of tubewell.
DHA City Karachi, Nooriabad, Sindh.
Shamsi Builders
Osmani Consultant
Geophysical Logging
Dismantling of installed submersible pump and Geophysical Logging (Gamma ray, Spontaneous potential, Natural Gamma, Single point resistance and caliper) for water well exploration for sand bed recognition and stratigraphic identification and the rank, quality, and its thickness, again installation and commissioning of tube well.
DHA City Karachi, Nooriabad, Sindh.
NLC
Osmani Consultant
Geophysical Logging
Dismantling of installed submersible pump and Geophysical Logging (Gamma ray, Spontaneous potential, Natural Gamma, Single point resistance and caliper) for water well exploration for sand bed recognition and stratigraphic identification and the rank, quality, and its thickness, again installation and commissioning of tube well.
DHA City Karachi, Nooriabad, Sindh.
FWO Eng. 494 Group DCK
Osmani Consultant
Geophysical Logging
Dismantling of installed submersible pump and Geophysical Logging (Gamma ray, Spontaneous potential, Natural Gamma, Single point resistance and caliper) for water well exploration for sand bed recognition and stratigraphic identification and the rank, quality, and its thickness, again installation and commissioning of tube well.
DHA City Karachi, Nooriabad, Sindh.
FWO HQ 494 Group
Construction of Tube well
Completion of tube well by the process of investigation drilling, complete aquifer study, yield test, borehole conversion into tube well by enlarging borehole diameter, lowering of casing and gravel packing, proceed by pump test for water quantity and quality and finally submission of the report.
Near PNS Shifa, Karachi, Sindh.
National Industrial Park
Electrical Resistivity Survey and Reconnaissance Survey
Complete walkthrough for demarcation of general overall properties of structure, tectonic, general geology, geomorphology, sedimentology and topography of an area and working ERS for determined the subsurface resistivity distribution by making measurements on the ground surface to delineate the aquifers, the sub-surface lithological conditions and behavior of groundwater such as lithological nature of different subsurface formations, thickness and lateral extent of subsoil formations.
Steel Mills, Port Qasim Area, Karachi, Sindh.
Pearl Confectionary
Construction of Tube well
Work done for water supply and reverse osmosis plant working by means of drilling work, complete study of aquifer, it’s zoning and demarcation, enlarge the diameter of drilled hole, design of tube well according to aquifer achieve, lowering of casing and shrouding of well, provision of submersible pump and providing the services till the procurement of pump to pearl confectionary, chemical analysis and completed by report writing including the summary of work done and formation encounter during drilled works.
S.I.T.E Industrial Area Karachi, Karachi, Sindh.
Agriculture development for locals
Construction of Tube well
Completion of 220 nos. tube well by the process of drilling of 12” Dia borehole construct into tube well by lowering of casing and gravel packing.
Johi, Waipandi, Dadu, Sindh.
Techno consultant international
Construction of Tube well
Finalized the tube well of 350ft deep by the supervision of hydrogeologist and with the help of skilled labor, drilled investigation borehole, worked out for aquifer’s potential it's marking and zoning, conversion of borehole into tube well, lowering of casing and gravel packing, pump test and report writing.
P.E.C.H.S, Karachi, Sindh.
International Power Global Development
Construction of Tube well
Finalized the tube well by the supervision of hydrogeologist and with the help of skilled labor, drilled investigation borehole, worked out for aquifer’s potential it's marking and zoning, conversion of borehole into tube well, lowering of casing and gravel packing, pump test and report writing.
Hubco, Hub, Baluchistan
Aviation Enclave
Central builders and developers
Rehabilitation work
Rehabilitation work at Aviation Enclave site which includes cleaning of well, installation of temporary casing o smaller size and wrapping of geotextile for central builders and developers.
Gadap, Karachi, Sindh.
Qatar Charity and Alkhidmat Karachi
Construction of Tube well
Completion of 350ft deep tube well by the process of investigation drilling, complete aquifer study, yield test, borehole conversion into tube well by enlarging borehole diameter, lowering of casing and gravel packing, proceed by pump test for water quantity and quality and finally submission of the report.
Gadap City, Karachi, Sindh.
Alkhidmat Khawateen Sindh
Construction of Tube well
Work is done for water supply by means of drilling work, complete study of aquifer, it’s zoning and demarcation, enlarge the diameter of drilled hole, design of tube well according to aquifer achieve, lowering of casing and shrouding of well, chemical analysis and completed by report writing including the summary of work done and formation encounter during drilled works.
Jamia Islamia, Manglabad, Hub, Baluchistan.
Asia Poultry feed
Construction of Tube well
Work done for water supply and reverse osmosis plant working by means of drilling work, complete study of aquifer, it’s zoning and demarcation, enlarge the diameter of drilled hole, design of tube well according to aquifer achieve, lowering of casing and shrouding of well, provision of submersible pump and providing the services till the procurement of pump to pearl confectionary, chemical analysis and completed by report writing including the summary of work done and formation encounter during drilled works.
Port Qasim, Karachi, Sindh.
Karachi Port Trust
Ask Technology
Hydrogeological modeling and pump test
Hydrogeological modeling and long pump test which includes supervision of pumping test, provision and execution pump test along with all accessories and generator set, modeling of hydrological properties of aquifer by means of Aquifer test Pro software by finding of storability, hydraulic conductivity, transmissivity and aquifer type.
Kpt, Karachi, Sindh.
PSO pump (Sayn Hajin Shah).
Construction of Tube well
Completion of tube well of 700ft deep by the process of investigation drilling, complete aquifer study, yield test, borehole conversion into tube well by enlarging borehole diameter, lowering of casing and gravel packing, proceed by pump test for water quantity and quality and finally submission of the report.
Jamshoro Tool Plaza, Jamshoro, Sindh.
MPA Syed Saleh Shah Jelani
Construction of Tube well
Finalized the 2 no’s tube well by the supervision of hydrogeologist and with the help of skilled labor, drilled investigation borehole, worked out for aquifer’s potential its marking and zoning, conversion of borehole into tube well, lowering of casing and gravel packing, provision and installation of submersible pump, pump test and report writing.
Naig Shareef, Sehwan, Sindh.
Al Shaheer Slaughter
Construction of Tube well
Construction of deep tube well 3 nos. for water supply has done which includes, drilling of investigation hole, hydrogeological study, yield test, conversion into tube well by enlarging the investigation hole diameter, provision and lowering of the casing and silica gravel packing followed to pump test for confirmation of water quality and quantity and last a comprehensive report writing.
Gadap, Karachi, Sindh.
KASB builders.
Dewatering
Designing, planning and supervision of dewatering work which includes the drilling of 40 nos. hole, provision of material, construction of production well, complete provision of a pumping system, management and supervision of pumping till the waterlogging issue is recovering at Clifton for KASB builders.
Clifton, Karachi, Sindh.
Hassan Industries
Construction of Tube well
Work is done for water supply by means of drilling work, complete study of aquifer, it’s zoning and demarcation, enlarge the diameter of drilled hole, design of tube well according to aquifer achieve, lowering of casing and shrouding of well, provision of submersible pump and providing the services till the procurement of pump, chemical analysis and completed by report writing including the summary of work done and formation encounter during drilled works.
North Industrial Area, Karachi, Sindh.
John Apparel
Rehabilitation work
Rehabilitation work for tube well and provision of complete submersible [pump along the drop pipe, electrical cable, Motor control unit, bolting accessories and commissioning of tube well after rehabilitation for John Apparel.
Landhi Industrial Area, Karachi, Sindh.
Rajby washing
Construction of Tube well
Completion of 2 no’s tube well by the process of investigation drilling, complete aquifer study, yield test, borehole conversion into tube well by enlarging borehole diameter, lowering of casing and gravel packing, proceed by pump test for water quantity and quality and finally submission of the report.
Korangi Industrial Area, Karachi, Sindh.
Al-Arz Real Estate
Dewatering work
Designing, planning and supervision of dewatering work which includes the drilling of 2 nos. hole, provision of material, construction of production well, complete provision of the pumping system, management and supervision of pumping till the waterlogging issue was recovered at Bath Island for Al-Arz Real Estate.
Bath Island, Karachi, Sindh.
Sindh Rural Survival Organization
Mehran drilling company.
Construction of Tube well
Construction of 2 nos. tube well of 250ft for water supply is done which includes, drilling of investigation hole, hydrogeological study, yield test, conversion into tube well by enlarging the investigation hole diameter from 8” to 16”, provision and lowering of casing and silica gravel packing followed to pump test for confirmation of water quality and quantity and last a comprehensive report writing.
Kachi Pully, Shadad Kot, Sindh.
Najam Farmhouse
Construction of Tube well
Work done for water supply by means of drilling work up to the 500ft deep, complete study of the aquifer, its zoning and demarcation, enlarge the diameter of the drilled hole, design of tube well according to aquifer achieve, lowering of casing and shrouding of well.
Gadap, Karachi, Sindh.
Orient Energy System
Geo Professionals
Electrical Resistivity survey
Determined the subsurface resistivity distribution by making measurements on the ground surface to delineate the aquifers, the sub-surface lithological conditions and behavior of groundwater such as lithological nature of different subsurface formations, thickness and lateral extent of subsoil formations.
S.I.T.E, Industrial Area, Karachi, Sindh.
COM3
Iqbal Engineering House
Electrical Resistivity survey
Examined the groundwater potential through curve matching system, modeling through software and values obtained by the Electrical Resistivity Survey Equipment and submitted a comprehensive recommendation and analyzed report to Descon Engineering.
Clifton, Karachi, Sindh.
Syed Saleh Shah Jelani (MPA)
Electrical Resistivity survey
Determined the subsurface resistivity distribution by making measurements on the ground surface to delineate the aquifers, the sub-surface lithological conditions and behavior of groundwater such as lithological nature of different subsurface formations, thickness and lateral extent of subsoil formations.
Naig Shareef, Sehwan, Sindh.
Bosicor Oil Refinery
Geo Professionals
Reconnaissance and Feasibility survey
Reconnaissance and Feasibility survey conduct for Bosicor Oil Refinery.
Hub, Baluchistan.
Karachi Circular Authority
EMC
Reconnaissance and Feasibility survey
Reconnaissance and Feasibility survey conduct for Karachi Circularity Authority with EMC.
Karachi, Sindh.
MRDL
DNT and rehabilitation work of tube wells
DNT and rehabilitation work of tube wells.
Tehlab, Taftan, Baluchistan
PAF
Geo Professionals
Electrical Resistivity survey
ERS with report writing, to determine the aquifer potential through the sub-surface lithological conditions, the behavior of groundwater, thickness and distribution of subsoil formations.
PAF Korangi Creek Base Karachi
Descon Engineering Pvt. Ltd.
Geo Professionals
Electrical Resistivity survey
Examined the groundwater potential through curve matching system, modeling through software and values obtained by the Electrical Resistivity Survey Equipment and submitted a comprehensive recommendation and analyzed report to Descon Engineering.
S.I.T.E, Industrial Area, Karachi, Sindh.
Helping hands
Study of various projects of water tube well
Feasibility study of various projects of water tube well for helping hands.
Sindh, Baluchistan.
Karachi Grammar School
Designing of Reverse Osmosis Plant
Designing of Reverse Osmosis Plant
Clifton, Karachi, Sindh
Pak Farms
Construction of Tube well
Construction of 2 no’s of tube well for water supply is done which includes, drilling of investigation hole, hydrogeological study, yield test, conversion into tube well by enlarging the investigation hole diameter , provision and lowering of casing and silica gravel packing followed to pump test for confirmation of water quality and quantity and last a comprehensive report writing.
Nooriabad, Jamshoro, Sindh.
Sardar Ashraf D. Baluch
Construction of Tube well
The hydrogeological investigation is done for Sardar Ashraf D. Baluch
Gaaj Dam Site, Qasba, Dadu, Sindh.
SGS
Construction of Tube well
Construction of tube well for water supply is done which includes, drilling of investigation hole, hydrogeological study, yield test, conversion into tube well by enlarging the investigation hole diameter from 8” to 16”, provision and lowering of casing and silica gravel packing followed to pump test for confirmation of water quality and quantity and last a comprehensive report writing.
Korangi Site Area, Karachi, Sindh.
MOL
SGS
Environmental studies
Drilling of monitoring well for Environmental studies which include drilling, provision of construction material and demarcation of water level and fetching out the water samples done at MOL site.
Kohat, Tal Block, NWFP.
Pakistan textile city limited
Geo Professionals
Electrical Resistivity survey
ERS with report writing, to determine the aquifer potential through the sub-surface lithological conditions, the behavior of groundwater, thickness and distribution of subsoil formations.
The site, Industrial Area, Karachi, Sindh.
CTE 750 FWO
Electrical Resistivity Survey
The vertical electrical sounding of the ground at five different locations, determining subsurface lithology from 5-100m, using Schlumberger configuration.
Gawadar, Baluchistan
Electrical Resistivity Survey
The vertical electrical sounding of the ground at five different locations, determining subsurface lithology from 5-150m, using Schlumberger configuration.
Gharo, Sindh
FFBL
SGS
Electrical Resistivity Survey
The vertical electrical sounding of the ground at five different locations, determining subsurface lithology from 5-250m, using Schlumberger configuration.
Pindi Bhattian, Punjab
KESTRAL SPD
Electrical Resistivity Survey
The vertical electrical sounding of the ground at five different locations, determining subsurface lithology from 5-100m, using Schlumberger configuration.
Hyderabad, Sindh
Sindh Coal Authority
Subzazar Pvt Ltd.
Core drilling of HQ size
Drilling the 8 nos. core drill of HQ size up to 700ft to 1000ft includes drilling, preservation, labeling of cores, provision of core boxes, geophysical logging
Sonda, Sindh
Nooriabad municipal corporation
Subzazar Pvt Ltd.
Construction of tube well
Construction of 2 nos. tube well includes drilling of test hole, yield test, enlarging of diameter and pump test after the construction of tube well
Nooriabad, Jamshoro, Sindh
Maza Mango Juice Pvt. Ltd.
Construction of tube well
Thatta, Sindh
Saif Energy
Nawaz Engineering
Investigation hole
Kathoor, Jamshoro, Sindh
Essa Cement
Nawaz Engineering
Construction of tube well
Construction of tube well for water supply is done which includes, drilling of investigation hole, hydrogeological study, yield test, conversion into tube well by enlarging the investigation hole diameter, provision and lowering of casing and silica gravel packing followed to pump test for confirmation of water quality and quantity and last a comprehensive report writing.
Nooriabad, Jamshoro, Sindh
Tafreeh In
Construction of tube well
Construction of tube well for water supply is done which includes, drilling of investigation hole, hydrogeological study, yield test, conversion into tube well by enlarging the investigation hole diameter, provision and lowering of casing and silica gravel packing followed to pump test for confirmation of water quality and quantity and last a comprehensive report writing.
Nagori, Gadap, Karachi, Sindh
Silver Textile
Deep Rock Drilling
Construction of tube well
Construction of 2 nos. tube well includes drilling of test hole, yield test, enlarging of diameter and pump test after the construction of tube well.
Nooriabad, Jamshoro, Sindh.
SGS Pvt. Ltd
Electrical Resistivity survey
ERS with report writing, to determine the aquifer potential through the sub-surface lithological conditions, the behavior of groundwater, thickness and distribution of subsoil formations.
Hala Nakah, Hyderabad, Sindh.
Lakhani Silk Mills
Compressor Washing
Bore wash by a running compressor
Karachi, Sindh
Candy land
Tube well construction
Hub Chowki,
P.A.F Masroor
Compressing Washing
Bore wash by running compressor and pump installation
Karachi, Sindh
CTE 790 FWO
Tube Well Construction
Karachi, Sindh
Al Mehran Builders
Tube Well Construction
Karachi, Sindh
Getz Pharma
Geo-Professional
Electrical Resistivity Survey
The vertical electrical sounding of the ground at five different locations, determining subsurface lithology from 5-50m, using Schlumberger configuration.
Karachi, Sindh
K-Electric
Geo-Professional
Electrical Resistivity Survey
The vertical electrical sounding of the ground at five different locations, determining subsurface lithology from 5-50m, using Schlumberger configuration.
Karachi, Sindh
Paragon
Tube Well Construction
Karachi, Sindh
Magnum Mall
Electrical Resistivity Survey
The vertical electrical sounding of the ground at five different locations, determining subsurface lithology from 5-50m, using Schlumberger configuration.
Hyderabad, Sindh
PAF Masroor
Geo-Professional
Electrical Resistivity Survey
The vertical electrical sounding of the ground at five different locations, determining subsurface lithology from 5-100m, using Schlumberger configuration.
Karachi, Sindh
Al-Karam
Geo-professional
Electrical Resistivity Survey
The vertical electrical sounding of the ground at five different locations, determining subsurface lithology from 5-50m, using Schlumberger configuration.
Karachi, Sindh
ZEST Consultants
Geo-Professional
Electrical Resistivity Survey
The vertical electrical sounding of the ground at five different locations, determining subsurface lithology from 5-50m, using Schlumberger configuration.
Hyderabad, Sindh
Nauras
Geo-Professional
Tube Well Construction
Karachi, Sindh
Tabba Hospital
Tube Well Construction
Karachi, Sindh
Khairpur special economic Zone (KSEZ)
Geo-Professional
Electrical Resistivity Survey
The vertical electrical sounding of the ground at five different locations, determining subsurface lithology from 5-100m, using Schlumberger configuration.
Khairpur, Sindh
Karachi Golf Club (KGC)
Geo-Professional
Electrical Resistivity Survey
The vertical electrical sounding of the ground at five different locations, determining subsurface lithology from 5-100m, using Schlumberger configuration.
Karachi, Sindh
Gul Ahmed
Electrical Resistivity Survey
The vertical electrical sounding of the ground at Total 04 probe conducted at different locations, determining subsurface lithology from 2-200m, using Schlumberger configuration.
Karachi
Galaxy Pharma
Electrical Resistivity Survey
he vertical electrical sounding of the ground at Total 03 probe conducted at different locations, determining subsurface lithology from 2-200m, using Schlumberger configuration.
Karachi
Pakistan Synthetic Limited
Electrical Resistivity Survey
The vertical electrical sounding of the ground at Total 10 probe conducted at different locations, determining subsurface lithology from 2-400m, using Schlumberger configuration.
H.I.T.E, Baluchistan
Masoom Flour Mill
Electrical Resistivity Survey
The vertical electrical sounding of the ground at Total 03 probe conducted at different locations, determining subsurface lithology from 2-300m, using Schlumberger configuration.
S.I.T.E Area, Karachi
Hinglaj Mandir
Geo-Professional
Electrical Resistivity Survey
The vertical electrical sounding of the ground at Total 04 probe conducted at different locations, determining subsurface lithology from 2-500m, using Schlumberger configuration.
Kund Malir, Baluchistan
Hill Park
Electrical Resistivity Survey
The vertical electrical sounding of the ground at Total 10 probe conducted at different locations, determining subsurface lithology from 2-300m, using Schlumberger configuration.
Karachi
Atlas Honda
Tube well Construction
Karachi
SECMC (Sindh Engro Coal Mining Company)
Tube well, Injection wells, R.O plant installation.
Drilling of a various borehole with depth varies from 500ft to 700ft at Ghurano, Ehsanshah jo tar, Mutto jo Tar, Shingiaro, Rescue Center, Green Park, Muslim Para, Hindu Para and T.F Hospital.
Tharparkar, Sindh
FPCL (FFBL Power Company Limited)
Geo-Professional
Tube well Construction
Karachi
Fortune Mountain Resources Pvt. Ltd.
Electrical Resistivity Survey at Chagai, Baluchistan
The vertical electrical sounding of the ground at four different locations, 03 probes conducted at each location determining subsurface lithology from 2-500m, using Schlumberger configuration
Chagai, Baluchistan
Gawadar Cantt
Electrical Resistivity Survey at Gawadar, Baluchistan
The vertical electrical sounding of the ground at Total 16 probe conducted at Seven different locations, 03 probes conducted at each location determining subsurface lithology from 2-500m, using Schlumberger configuration
Gawadar, Baluchistan
Denim-E Clothing
Electrical Resistivity Survey and Tube Well Construction
Karachi
APAG Oil Pvt. LTD.
Electrical Resistivity Survey and Tube Well Construction
Karachi
Advance Metal PVT. LTD
Electrical Resistivity Survey and Tube Well Construction
Hub
Baluchistan Development Authority (BDA)
Electrical Resistivity Survey at Ship Breaking Yard, Gaddani, Baluchistan
The vertical electrical sounding of the ground at Total 05 probe conducted at different locations, determining subsurface lithology from 2-400m, using Schlumberger configuration
Gaddani, Baluchistan
Buksh Dyeing
Tube well construction
Karachi, Sindh
Indus Pharma
Compressor Washing
Bore wash by the running compressor
Karachi, Sindh
Al-Abbas
Tube well construction
Karachi, Sindh
KESZ
Tube well construction
Khairpur
Meezan Beverage
Tube well construction
Karachi, Sindh
B.L. Harbert International.
Tube Well Construction at U.S Embassy
Islamabad
Sindh Engro Coal Mining Corporation
Coal Reservoir Budgeting and Estimation of Thar Block II
Drilling of 56 boreholes of HQ core drilling up to 220m to 280m for coal estimation, through geological and geophysical data collection and interpretation
THAR Block II
Garrison Engineer
WATER SUPPLY SCHEME (PH-01) CA NO DW&CE, SPD/41/2018, NOORIABAD, NEAR DHA CITY.
Nooriabad, Near DHA City.
Thar Foundation Hospital
Tube well Construction
Tharparkar, Sindh
HS Crete
Tube well Construction
Ghaghar Phatak, Karachi
Shafi Glucochem
Tube well Construction
H.I.T.E, Baluchistan
Siddiqsons Tin Plating
Tubewell Construction
Hub, Baluchistan
Matrix Pharma
Dewatering well
Drilling of 50ft. production well and 02 piezometer well up to 40ft. Long Pump test for the model assumption.
Korangi Industrial Park, Karachi
Gumcorp
Tube well Construction
Port Qasim, Karachi.
Iqbal Dyeing, DCC
Tube well Construction
Korangi, Karachi
Karachi Club
Tube well Construction
Karachi
Shangrilla Pvt. Ltd.
Tube well Construction
Gulshan-E-Maymar, Karachi.
Amcorp-Kadanwari
Tube well construction
Karachi.
Qadri Noori Enterprises Fisheries
03 Tube well Construction
Drilling of 03 boreholes up to 700ft. depth. Installation of casing up to 700ft., gravel packing and bore washing by a submersible pump.
Fisheries, Karachi
Nabi Qasim Industries (Pvt) Ltd
Tube Well Construction
Korangi, Karachi
Denim Clothing Company
02 Tube well Construction
Korangi, Karachi
Reckitt Benckiser
Electrical Resistivity Survey Tube Well Construction
S.I.T.E, Karachi
Classic Flour Mills
Electrical Resistivity Survey
The vertical electrical sounding of the ground at Total 04 probe conducted at different locations, determining subsurface lithology from 2-300m, using Schlumberger configuration.
Karachi
Sunrise Plastic Industris (PVT.) LTD
Enerzone Engineering Services
Electrical Resistivity Survey Tube Well Construction at Sunrise Plastic
Rahim Yar Khan Industrial Estate, Punjab
Shahnawaz Coorporative Housing Society
Geo-Professional
Electrical Resistivity Survey
The vertical electrical sounding of the ground at Total 06 probe conducted at different locations, determining subsurface lithology from 2-400m, using Schlumberger configuration.
Gulshan-E-Maymar, Karachi.
RO Plant
Geo-Professional
Electrical Resistivity Survey
The vertical electrical sounding of the ground at Total 04 probe conducted at different locations, determining subsurface lithology from 2-500m, using Schlumberger configuration.
Javed Bahria Housing Society, Karachi
Security Paper Limited
Electrical Resistivity Survey
The vertical electrical sounding of the ground at Total 10 probe conducted at different locations, determining subsurface lithology from 2-300m, using Schlumberger configuration.
Malir, Karachi
Pakistan Cable Ltd.
Electrical Resistivity Survey
The vertical electrical sounding of the ground at Total 04 probe conducted at different locations, determining subsurface lithology from 2-300m, using Schlumberger configuration.
Nooriabad
YKK Zip Company
Electrical Resistivity Survey
The vertical electrical sounding of the ground at Total 05 probe conducted at different locations, determining subsurface lithology from 2-400m, using Schlumberger configuration.
Export Processing Zone, Karachi
Denim Clothing Company DCC
Electrical Resistivity Survey
The vertical electrical sounding of the ground at Total 02 probe conducted at different locations, determining subsurface lithology from 2-500m, using Schlumberger configuration.
Korangi, Karachi
Burj Builders and Developers
Geo-Professional
Electrical Resistivity Survey
The vertical electrical sounding of the ground at Total 03 probe conducted at different locations, determining subsurface lithology from 2-150m, using Schlumberger configuration.
Saddar City, Karachi
NS Property and Network
Electrical Resistivity Survey
The vertical electrical sounding of the ground at Total 03 probe conducted at different locations, determining subsurface lithology from 2-300m, using Schlumberger configuration.
Maripur, Karachi
MEDECINS SANS FRONTIERES INTERNATIONAL (MSF).
Electrical Resistivity Survey
The vertical electrical sounding of the ground at Total 05 probe conducted at different locations, determining subsurface lithology from 2-500m, using Schlumberger configuration.
Machar Colony, Karachi
Aquagen Pvt. Ltd. (APL)
Electrical Resistivity Survey
The vertical electrical sounding of the ground at Total 03 probe conducted at different locations, determining subsurface lithology from 2-300m, using Schlumberger configuration.
PNS Karsaz, Karachi
National Food Ltd. (NFL)
Electrical Resistivity Survey
The vertical electrical sounding of the ground at Total 06 probe conducted at different locations, determining subsurface lithology from 2-30m, using Wanner configuration for earthing Bore
Port Qasim, Karachi
Hui Feng International Trade Private Ltd.
Electrical Resistivity Survey
The vertical electrical sounding of the ground at Total 04 probe conducted at different locations, determining subsurface lithology from 2-400m, using Schlumberger configuration.
Moach Goth, Karachi
Crete One
Electrical Resistivity Survey
The vertical electrical sounding of the ground at Total 03 probe conducted at different locations, determining subsurface lithology from 2-200m, using Schlumberger configuration.
Murad Memon Goth, Karachi
Martin Dow
Electrical Resistivity Survey Tube Well Construction at Martin Dow
Korangi, Karachi
Karachi International Container Terminal (KICT)
Tube Well Construction at KICT
Dockyard, Karachi
Al-Parveen Paper Mill LTD.
Geo-Professional
Electrical Resistivity Survey
The vertical electrical sounding of the ground at Total 03 probe conducted at different locations, determining subsurface lithology from 2-400m, using Schlumberger configuration.
Kotri Industrial Area, Sindh
Clarient Chemical Pakistan PVT. LTD
Electrical Resistivity Survey
The vertical electrical sounding of the ground at Total 04 probe conducted at different locations, determining subsurface lithology from 2-120m, using Schlumberger configuration.
Korangi, Karachi
Soorty Enterprises PVT. LTD
Electrical Resistivity Survey
The vertical electrical sounding of the ground at Total 03 probe conducted at different locations, determining subsurface lithology from 2-500m, using Schlumberger configuration.
Korangi, Karachi
Burj Builders and Developers
Geo-Professional
Electrical Resistivity Survey
The vertical electrical sounding of the ground at Total 03 probe conducted at different locations, determining subsurface lithology from 2-150m, using Schlumberger configuration.
Saddar City, Karachi